Similar Projects
Gatewood ES Exterior Door and HVAC Upgrades
Alteration
Bidding
$2,100,000 to $2,400,000 est. value
Seattle, WA 98136

Vinland Elementary School HVAC Replacement
Alteration
Bidding
$3,400,000 est. value
Poulsbo, WA 98370

HVAC and Mechanical Products
Term Contract
Post-Bid

HVAC and Mechanical Products
Term Contract
Post-Bid

North Franklin School District Connell High School HVAC Replacements
Alteration
Results
Connell, Pasco, WA 99326

51st Circle HVAC Purchase and Installation
Alteration
Results
Vancouver, WA 98661

Poulsbo Middle School Building 3 HVAC Replacement
Alteration
Bidding
$550,000 est. value
Poulsbo, WA 98370

HVAC and Mechanical Products and Solutions
Term Contract
Post-Bid

Clallam County Courthouse VAV Replacement Project
Alteration
Results
$330,000 est. value
Port Angeles, WA 98362

YVS Main Building HVAC Repairs
Alteration
Bidding
$187,000 to $330,000 est. value
Olympia, WA

City Hall HVAC Monitoring
Alteration
Post-Bid
$28,840 est. value
Sammamish, WA 98075

PPWWTF Solids Drying Heat Exchanger Repairs
Alteration
Results
$200,000 to $250,000 est. value
Edmonds, WA 98020

WCCW MSU Building Climate Control Improvements
Alteration
Bidding
$860,000 to $1,010,000 est. value
Gig Harbor, WA 98332

Master Contract for HVAC Service - Statewide Opportunities
Term Contract
Post-Bid

Headquarters Diesel Exhaust Removal System
Alteration
Results
$92,500 est. value
Belfair, WA 98528

Last Updated 01/18/2022 12:00 AM
Project Title

County-City Building Property Room Exhaust Addition

Physical Address View project details and contacts
City, State (County) Tacoma, WA 98402   (Pierce County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $100,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Contractor shall provide all labor, materials, tools, equipment, transportation, supplies, and incidentals required to complete all contract work. Omissions from the contract of details of work which are necessary to carry out the intent of the contract, or which are customarily performed, shall not relieve the Contractor from. performing the omitted work, but they shall be performed as if fully and correctly set forth and described in the contract. The unit contract bid prices shall be full pay for all work and materials required to complete the work. Add new exhaust grills, dampers and ducts in basement property room, new exhaust fan at 5th floor roof level mechanical room, re-balance exhaust and make up air systems. Provide electrical work for new fan.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents