Similar Projects
RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Conception
$1,500,000 CJ est. value
Seattle, WA 98174

2021 Crestfield Subdivision Resurfacing
Post-Bid
Indian Creek, IL

Asphalt Roadway
Post-Bid
Deerfield, IL

2020 Alley and Parking Lot Improvements
Infrastructure
Results
Waukegan, IL 60085

2020 Alley and Parking Lot Improvements
Infrastructure
Results
Waukegan, IL 60085

2021 Thermoplastic Lane Marking Material & Labor
Term Contract
Post-Bid

Sealcoating and Striping at Various Locations
Results
Lake Zurich, IL

Wickham Court Watermain Extension
Post-Bid
Green Oaks, IL 60048

Banbury Road Improvements
Results
Less than $2,097,480 est. value
Mundelein, IL

2021 Parking Lot Improvements at Lakes Community& Antioch HS
Post-Bid
Antioch, Lake Villa, IL 60002

US-12 Sidewalk
Results
Less than $784,953 est. value
Fox Lake, IL

Pulverization of Margate, Parkhill, Crescent Knoll and Portions of Minard Lane
Post-Bid
Green Oaks, IL

2021 Road Program
Results
Lake Zurich, IL

2021 Road Improvement Program Contract A
Post-Bid
Green Oaks, IL

2021 Roadway Improvements
Results
IL

Last Updated 08/22/2022 03:07 PM
Project Title

Briarwoods Drainage Improvements

Physical Address View project details and contacts
City, State (County) Lincolnshire, IL 60069   (Lake County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $263,301 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The proposed project consists of the improvement of 2 detention areas in the Village of Lincolnshire. The work includes vegetation removal, earth excavation, top soil respreading, seeding and erosion control. Storm sewer installation, curb and gutter and bike path removal and replacement, traffic control, and all other related items are also included in the project. All Contracts for Public Works are subject to the Illinois Prevailing Wage Act (820 ILCS 130/1-12) and the Employment of Illinois Workers on Public Works Act (30 ILCS 570). The Village of Lincolnshire reserves the right to defer the acceptance of a proposal for a period not to exceed 90 calendar days after the date proposals are received and to accept or reject all proposals and to waive technicalities and to accept the proposal which best meets the needs and requirements of the municipalities as outlined in the Request for Proposals.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents