Similar Projects
Last Updated | 08/22/2022 03:07 PM |
Project Title | Briarwoods Drainage Improvements |
Physical Address | View project details and contacts |
City, State (County) | Lincolnshire, IL 60069 (Lake County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines |
Contracting Method | Competitive Bids |
Project Status | Construction start expected October 2022 |
Bids Due | View project details and contacts |
Estimated Value | $263,301 [brand] Estimate |
Plans Available from | Municipal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The proposed project consists of the improvement of 2 detention areas in the Village of Lincolnshire. The work includes vegetation removal, earth excavation, top soil respreading, seeding and erosion control. Storm sewer installation, curb and gutter and bike path removal and replacement, traffic control, and all other related items are also included in the project. All Contracts for Public Works are subject to the Illinois Prevailing Wage Act (820 ILCS 130/1-12) and the Employment of Illinois Workers on Public Works Act (30 ILCS 570). The Village of Lincolnshire reserves the right to defer the acceptance of a proposal for a period not to exceed 90 calendar days after the date proposals are received and to accept or reject all proposals and to waive technicalities and to accept the proposal which best meets the needs and requirements of the municipalities as outlined in the Request for Proposals. |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |