Similar Projects
South Cairns Development
New Construction
Design
Sandy, UT 84070

Alta Depot
New Construction - 434,303 SF
Design
$10,000,000 CJ est. value
Salt Lake City, UT 84102

New Parking Lot and Elevated Parking Deck Adjacent to City Hall
Post-Bid
Saint George, UT 84770

255 South State Street Mixed Use
New Construction - 271,859 SF
Post-Bid
$10,000,000 CJ est. value
Salt Lake City, UT

Two-Phase Design-Build Ground Based Strategic Deterrent Mission Integration Facility (GBSD)
New Construction - 140,000 SF
Results
$25,000,000 to $100,000,000 est. value
Ogden, UT 84056

525 Plaza Building Parking Structure Repair
Results
$1,721,332 est. value
Salt Lake City, UT 84102

6th and Main
New Construction, Demolition - 275,423 SF
Construction
$51,476,000 est. value
Salt Lake City, UT 84115

Conference Hotel (MWR Facility ) at Mayflower Mountain Resort
New Construction - 615,055 SF
Construction
Park City, UT 84060

Park City Mountain Resort Parking Lot
New Construction
Pending Verification
Park City, UT

Mountain Tech South Lot 5
New Construction - 389,377 SF
Pending Verification
$10,000,000 CJ est. value
Lindon, UT

South Highland Mixed Use
New Construction - 166,481 SF
Design
$10,000,000 CJ est. value
Millcreek, UT

Saint George Site Improvement - Parking Garage
Post-Bid
Saint George, UT 84770

Parking Structure Demolition and New Construction
Demolition
Results
Ogden, UT

Sage Valley Apartments
New Construction - 704,593 SF
Construction
West Valley City, UT 84044

Rees Capital Office
New Construction - 4,329 SF
Pending Verification
$1,000,000 to $5,000,000 CJ est. value
Sandy, UT

Last Updated 04/30/2020 01:23 PM
Project Title

Dfcm Construction-Uu Hs Garage, Roadway, Ped Connector/Mario Capecchi Intersection

Physical Address View project details and contacts
City, State (County) Salt Lake City, UT   (Salt Lake County)
Category(s) Heavy and Highway
Sub-Category(s) Parking Garage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project includes preconstruction and full construction services for the construction of a 1,400 car parking garage equaling a 462,125 sf, eight-level structure with pedestrian walkways/bridges connectors, the realignment.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing.
Division 10 - Specialties, Signage, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 11 - Equipment, Vehicle and Pedestrian Equipment.
Division 21 - Fire Suppression.
Division 26 - Electrical, Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 28 - Electronic Safety and Security, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents