Similar Projects
Downtown Streetscape and Utility Improvements, Phase II
Post-Bid
Gainesville, GA 30501

Parking Lot and Trailhead
Post-Bid
Sandersville, GA

Walking Trail at Meridian Park
Results
Loganville, GA 30655

Parking Lot Resurfacing Repair of the Welcome Center Parking Lot
Results
Lincolnton, GA 30817

Perimeter Marketplace
New Construction - 60,400 SF
Construction
Dunwoody, GA 30338

Amazon Parking Lot Expansion
Construction
Smyrna, GA

Cedar Walk Apartments
Post-Bid
Hinesville, GA 31313

General Contractor Site Clearing and Grading for New Athletic Field Saddle Ridge Elementary and Middle School
Results
Less than $1,118,000 est. value
Rock Spring, GA 30739

K-12 New Parking Lot
Post-Bid
GA

Jeff Davis County BOE Site Work
Results
Hazlehurst, GA

Building Demolition and Site Improvements at William Hubbard School
Demolition
Post-Bid
Forsyth, GA 31029

2019 Parking Lot Rehabilitation
Results
Clarkesville, GA 30523

Concrete Walkway - Governors Drive
Post-Bid
Forest Park, GA 30297

Construction Services for South STEM School Site
Results
Less than $1,325,800 est. value
Fairburn, GA 30213

Blakely Gateway Project
Post-Bid
Less than $800,000 est. value
Blakely, GA 31723

Reported 04/16/2021 12:00 AM
Project Title

Site Improvements for Rome Fire Department Burn Building

Physical Address View project details and contacts
City, State (County) Rome, GA   (Floyd County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

This project consists of the installation of a perimeter storm drainage system, water quality unit, catch basin, drainage basins, 30-inch curb and gutter, concrete apron and associated grading and installation of GAB. In an effort to advance the project, the City of Rome will purchase and have all drainage pipe, water quality unit, and Nyloplast drainage basins onsite when the project begins. The procurement of materials for the catch basin will be the responsibility of the contractor.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete.
Division 31 - Earthwork, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents