Similar Projects
Armstrong Tennis LED Lights and Parking Lot/Lights - City of Norwich
Renovation, Alteration
Conception
$195,000 est. value
Norwich, CT

ADA Entrance Improvements
Infrastructure
Bidding
$80,000 est. value
Waterford, CT 06385

Paving - Preston Plains Middle School Parking Lot
Infrastructure
Post-Bid
Preston, CT

Sidewalk Construction and Repair
Infrastructure
Post-Bid
$250,000 est. value
Stonington, CT

New Sidewalk Construction
Results
Old Lyme, CT 06371

Boswell Avenue Sidewalk Project
Results
Norwich, CT

Rehabilitation of Fire Headquarters Parking Lot
Infrastructure
Post-Bid
$220,000 est. value
Colchester, CT 06415

North Main Street ADA Sidewalk Ramps
Results
Norwich, CT

Sayles School Parking Lot Clean, Reseal, and Restripe
Infrastructure
Post-Bid
$600,000 est. value
Sprague, CT 06330

Multi-Use Trail
Infrastructure
Results
New London, CT 06320

Parklets for Downtown Norwich
Infrastructure
Post-Bid
Norwich, CT

Repairs and Improvements at the Marina Parking Lot
Infrastructure
Results
New London, CT

Dunham Street Roadway and Sidewalk Reconstruction Project
Infrastructure
Results
Norwich, CT

Norwich PD HQ Upper Parking Lot Reconstruction
Infrastructure
Results
Norwich, CT 06360

Strawberry Fields Sidewalk Repair Phase 2
Infrastructure
Results
Lisbon, CT

Reported 06/23/2022 02:15 PM
Project Title

Lower Broadway Complete Streets Improvement - City of Norwich

Physical Address View project details and contacts
City, State (County) Norwich, CT   (New London County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Conceptual Design, Construction Start Expected June 2023
Bids Due View project details and contacts
Estimated Value $150,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Site work and paving for a mixed-use development in Norwich, Connecticut. Conceptual plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot. Sidewalk expansion and reconfiguration to allow for increased outdoor gathering and dining space in the central city. This area will provide a safe location for pedestrians, patrons, and the general public to enjoy outdoor activities. Businesses and Restaurants on Lower Broadway will have an expanded space to serve customers and the public in a safe manner. As of June 22, 2022, this project is in the early planning phase. An engineer has not been selected. Although a firm timeline for construction has not been determined, construction is not expected to start prior to May 2023.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents