Similar Projects
West Intake Screen #2 Gearbox Replacement
Renovation
Sub-Bidding
$400,000 CJ est. value
Topeka, KS 66612

Nitrogen Compressor
Term Contract
Post-Bid
Overland Park, KS

Hydro Excavation Trailer and Valve Exerciser
Alteration
Post-Bid
Gardner, KS

Northwestern Division Crane Multiple-Award Task Order Contract (MATOC)
Results
$2,000 to $99,900,000 est. value

Northwestern Division Crane Multiple-Award Task Order Contract (MATOC)
Results
$2,000 to $99,900,000 est. value

Golf Course Mowing Equipment
Alteration
Post-Bid
Wichita, KS

Loader/Backhoe for Water Distribution Division
Alteration
Results
Topeka, KS

Parking Control Equipment
Term Contract
Post-Bid
KS

Replace Harmonic Filter B56
Term Contract
Results
$25,000 to $100,000 est. value
KS

40,000 LB GVWR Utility Trailers
Alteration
Post-Bid
Wichita, KS

4-Leg Parallelogram Lift System
Alteration
Results
$330,000 est. value
Topeka, KS 66603

Portable Dirt Screening Plant
Alteration
Post-Bid
Topeka, KS

Trailer Mouted Air Compressor
Alteration
Post-Bid
Wichita, KS

Annual Air Compressor Maintenance and Service
Term Contract
Post-Bid
Topeka, KS

Full Circle Clamp Couplings (Repair Clamps)
Term Contract
Post-Bid
Topeka, KS

Last Updated 08/24/2022 11:05 AM
Project Title

Primary Clarifier 2 Repair or Replace Bent Frame Arm

Physical Address View project details and contacts
City, State (County) Topeka, KS 66616   (Shawnee County)
Category(s) Single Trades
Sub-Category(s) Equipment
Contracting Method Competitive Bids
Project Status Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $400,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

As of Aug 24 the project was cancelled. Q And A Open 7/6/2022 11:56:00 PM Q And A Close 7/19/2022 10:30:00 PM This project is for the repair or replacement of the existing damaged frame arm along with any and all necessary attachments. The contractor is responsible for the following: 1. Repair or replace the existing damaged arm and necessary attachments. 2. Configure to match existing setup. 3. Repair metal or replacement arm must be 316 stainless steel or epoxy coated, and all fasteners (nuts, bolts, washers, etc.) must be 316 stainless steel. Sub-location Primary Clarifier Number 2 Terms 1. Warranty: Lump sum bid totals shall include a minimum one year warranty on all labor. 2. The City requests that the project be completed on or before August 1st, 2022. 3. Totals: Bidders must enter their lump sum total to include all parts, equipment, materials, and labor in their line item response when submitting their electronic bid. 4. All questions concerning the requirements set forth herein shall be electronically submitted in the e-Pro system under the bid event section for questions.

Details

Division 11 - Equipment, Operation and Maintenance of Equipment, Vehicle Service Equipment, Maintenance Equipment, Unit Kitchens, Residential Equipment, Residential Appliances, Agricultural Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents