Similar Projects
Construction of Concrete Curb Ramps and Retrofitting Existing Ramps (Contract B)
Infrastructure
Bidding
$400,000 est. value

FY23 ADA Improvements
Infrastructure
Bidding
$400,000 est. value
Harrisburg, NC

On-Street Parking and Curb Lane Management
Infrastructure
Post-Bid
Charlotte, NC

Development Services - Library and Senior Center Facility
New Construction, Infrastructure - 40,000 SF
Post-Bid
Concord, NC 28027

Bethel School Road Sidewalk Improvements
Results
$100,000 to $200,000 est. value
Midland, NC

Rowan-Cabarrus Community College College Station Campus Walking Ramp Installation
Results
Kannapolis, NC 28083

General Aviation Terminal Parking Lot Rehabilitation
Infrastructure
Post-Bid
Concord, NC 28027

Coddle Creek Greenway - Afton Run
Infrastructure
Results
$575,313 est. value
Concord, NC

Sandy Porter Road/ South Tryon Street Intersection Improvement (PMES51216020)
Infrastructure
Results
$1,069,000 est. value
Charlotte, NC

Rowan-Cabarrus Community College South Campus Parking Lot Repairs
Infrastructure
Results
Concord, NC

Sidewalk System Work
Infrastructure
Results
Concord, NC

Wilson Street Park - Phase I
New Construction, Infrastructure
Results
$70,000 est. value
Concord, NC 28025

Concord Middle School Parking Lot Improvements
Infrastructure
Results
Less than $500,000 est. value
Concord, NC 28025

Construction of Concrete Curb Ramps and Retrofitting Existing Ramps (Contract B)
Infrastructure
Results

Swink Street Southwest Sidewalk Extension
Infrastructure
Results
Concord, NC 28027

Last Updated 06/13/2022 09:56 AM
Project Title

North End Around Taxiway (Neat) - Private Access Drive Construction

Physical Address View project details and contacts
City, State (County) Charlotte, NC   (Cabarrus County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The purpose of this project is to construct a new access drive along the western edge of Long Term #1 parking lot to allow Long Term #1 exiting customers access to Wilkinson Blvd as well as access for terminal deliveries and Gate 80 traffic. This work will include roadway, storm drainage, traffic signal, fiber installation, parking lot, water and sewer relocation, and landscaping. The project will include work on CLT owned property as well as NCDOT owned facilities. Completion of this project allows CLT Airport to take a portion of Old Dowd road out of service for North End Around Taxiway improvements.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Erosion and Sedimentation Controls, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs, Storm Drainage Structures.
Division 34 - Transportation, Transportation Signaling and Control Equipment, Roadway Signaling and Control Equipment, Traffic Signals, Traffic Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents