Similar Projects
Amazon Sortation Facility - Project Oak / Atlanta
New Construction, Infrastructure - 3,200,000 SF
Design
$300,000,000 CJ est. value
Emerson, GA 30137

I-75 From SR 61 / Bartow to CR 373 / Dew Pond Road / Gordon
Infrastructure
Design
$20,000,000 CJ est. value
Cartersville, GA 30184

Frankie Harris Park
Infrastructure
Bidding
$240,000 CJ est. value
Euharlee, GA 30120

Frankie Harris Park
Infrastructure
Bidding
$240,000 CJ est. value
Euharlee, GA 30120

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Pickleball Courts at Dellinger Park
Infrastructure
Post-Bid
$40,000 CJ est. value
Cartersville, GA 30120

Old Alabama Road Utility Relocation, Phase II
Results
$3,541,060 est. value
Cartersville, GA 30120

Meter Change Out Services
Infrastructure
Results
$700,000 est. value
GA

North Bartow Interchange Feasibility Study (New I75 interchange) - Bartow County
Infrastructure
Pending Verification
$5,000,000 CJ est. value
Cartersville, GA 30120

U-Haul Moving and Storage/Retail / Cartersville
New Construction, Infrastructure - 90,000 SF
Pending Verification
$10,000,000 CJ est. value
Cartersville, GA 30120

SR 3 / US 41 SB at SR 293 / CSX #340429d in Emerson
Demolition, New Construction, Infrastructure
Design
$6,000,000 CJ est. value
Cartersville, GA 30121

Leo Cottages / Cartersville
New Construction, Infrastructure
Bidding
$2,500,000 CJ est. value
Cartersville, GA 30120

The Varsity / Cartersville
New Construction, Infrastructure - 4,449 SF
Post-Bid
$2,250,000 CJ est. value
Cartersville, GA 30121

Hamilton Crossing Waterline Relocation
Infrastructure
Results
$650,000 est. value
Cartersville, GA

Agriculture Meter Installation
Infrastructure
Results

Last Updated 10/03/2022 10:07 AM
Project Title

Water and Sewer Improvements - Old Alabama Road Utility Relocation - Phase III

Physical Address View project details and contacts
City, State (County) Cartersville, GA 30120   (Bartow County)
Category(s) Heavy and Highway, Outdoor Lighting, Sewer and Water
Sub-Category(s) Roadway Lighting, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $4,600,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Bids received after 3:00 PM will be returned to the Bidder un-opened. The Work consists of furnishing all labor, materials, tools, equipment and incidentals necessary for construction of relocated water and sewer facilities in connection with GDOT's Old Alabama Road Project - P.I. 621410. The Work consists of two Divisions which, if awarded, will be awarded as a single Contract. Division One - Water: Approx. 8,200 LF of 16-inch DIP water main, 1,700 LF of 8-inch DIP water main, 800 LF of 6-inch DIP water main, 140 LF of 24-inch steel casing (open cut and bored), 640 LF of 16-inch steel casing (open cut or bored), 200 LF of 12-inch steel casing (open cut and bored), 21 gate valves (6-in to 16-in), 12 fire hydrants, and 26 service re-connections; all with related, flushing, hydrostatic testing, and disinfection, traffic control, clearing, erosion control, grassing, restoration, pavement replacement, and clean-up. Division Two - Sewer: Approx. 9,000 LF of 8-inch PVC wastewater forcemain, 2,900 LF of 4-inch PVC wastewater forcemain, 163 LF of 24 -inch steel casing (bored in place), 580 LF of 16-inch steel casing (open cut and bored), 180 LF of 12-inch steel casing, a minor creek crossing, 6 linestops on existing 8-inch PVC forcemain, and 2 linestops on existing 4-inch PVC forcemain; all with related fittings, connections, appurtenances, testing, traffic control, clearing, erosion control, grassing, restoration, pavement replacement, and clean-up. All Work must conform to the requirements of the Georgia EPD General Permit GAR 100002. The Project will be funded under the American Rescue Plan Act (ARPA). Payment for the Work will be made on the basis of Contractor's periodic Applications-for-Payment processed by the Engineer. Refer to other bidding requirements in Section 00200 - Instructions to Bidders included in the Bidding Documents. In accordance with O.C.G.A. 43-41-1, Bidders must submit a photocopy of their Georgia Contractor License. Contractors and comply with all provisions of the "Georgia Security and Immigration Compliance Act" (O.C.G.A. 13-10-91 and O.C.G.A. 50-36-1). The Successful Bidder must certify compliance with all applicable state and federal laws regarding maintaining a drug-free workplace and certify compliance with federal Executive Order 11246 regarding Equal Employment Opportunity. The Successful Bidder must comply with federal Labor Standards and Prevailing Wage Requirements (Davis Bacon Wages), and all other state and federal laws and regulations applicable to funding under by the American Rescue Plan Act (ARPA) to be administered under Georgia Environmental Finance Authority's State Revolving Fund (SRF) program. The right is reserved by the Owner to delay the award of the Contract for a period not to exceed sixty (60) days from the date of opening of the bids, during which time the bids shall remain open and not subject to withdrawal. The Owner reserves the right to reject any and all bids, to waive any and all technicalities or informalities. If an award made, the award will be made to the responsible and responsive Bidder having the lowest Total Base Bid plus selected alternatives for Division One and Division Two combined.

Details

Division 26 - Electrical, Lighting, Exterior Lighting, Lighting Poles and Standards.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents