Similar Projects
C1DA--VISN 21 Master Planning/Study A/E IDIQ
New Construction, Term Contract
Design
$50,000,000 to $100,000,000 est. value

RFP Design - Design of Storm Water Pump Station D Component Upgrade
Renovation, Infrastructure
Bidding
$2,200,000 CJ est. value
San Diego, CA 92110

RFP - Capital Improvement Projects: Project Management
Term Contract
Bidding
Oceanside, CA 92054

Engineering, Planning and Development
Post-Bid

Indefinite-Delivery Indefinite-Quantity Architect-Engineer Contract; Mechanical, Electrical, Plumbing And Fire Protection; Navfac Sw
Term Contract
Post-Bid
$5,000 to $40,000,000 est. value

FAA Airport Traffic Control Tower Design Competition
New Construction
Results

RFP - On-Call Mobility Technology and Intelligent Transportation Systems (ITS) Services
Term Contract
Bidding
San Diego, CA 92101

Unrestricted Architect-Engineering Airfield Paving Design MATOC
Term Contract
Post-Bid
Less than $30,000,000 est. value

RFP - Oakdale Alameda Beautification Project Professional Services
Term Contract
Bidding
El Cajon, CA 92020

A-E IDIQ Surveying and Mapping
New Construction, Term Contract
Post-Bid
$10,000,000 est. value

RFP - Cays Park Master Plan Consulting Services
Term Contract
Bidding
Coronado, CA 92118

Architect-Engineer - Air Field Pavement Design MATOC
New Construction, Term Contract
Post-Bid

C1da--Visn 21 Design A/E IDIQ 2022-2027
New Construction
Post-Bid

Unr AE Afp Design MATOC
New Construction, Term Contract
Post-Bid
Less than $30,000,000 est. value

$98M AE IDCs for Fuel Design and Inspection Services, Worldwide
Renovation, Term Contract
Post-Bid
Less than $98,000,000 est. value

Last Updated 10/12/2022 09:06 AM
Project Title

RFP - Transportation Department As-Needed Engineering Support

Physical Address View project details and contacts
City, State (County) San Diego, CA 92101   (San Diego County)
Category(s) Professional Services
Sub-Category(s) Architectural
Contracting Method Competitive Bids
Project Status Construction start expected April 2023 , Request For Proposals
Bids Due View project details and contacts
Estimated Value $15,000,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Bid Bond 0.00% Payment Bond 0.00% Performance Bond 0.00% Pre-Bid Meeting No Online Q&A No Project Duration Sixty (60) Month The City of San Diego (City) Transportation Department consists of three interconnected divisions: Transportation Engineering, Right of Way Management and Street Division. The Design Professional chosen from this solicitation will be used by the entire Transportation Engineering Operations Division, Street Division and Right of Way Management Division. Design Professional shall provide an array of engineering and related services to support the Transportation Department on a per task order basis. At a minimum, the Design Professional must be able to perform services in the anticipated general areas delineated in the scope services below. These areas are not exclusive or exhaustive, and additional areas may be identified in the future. The scope is for as-needed engineering services to support the City of San Diego's Transportation Department with various engineering (design & non-design), as well as operations and maintenance programs and projects. Separate task orders developed for as-needed support shall describe a specific scope, schedule, and compensation necessary to complete a given task issued by Transportation Department staff. Before services begin on any specific task, the contract manager shall sign and authorize the services to be done. The typical tasks listed below envision elements of the services that shall be performed by the Design Professional; however, not all tasks outlined shall necessarily be authorized during the performance of this contract and/or for each separate task. Transportation Department reserves the right to modify or substitute as-needed tasks to meet the goals of the City's Transportation Department. The City shall apply a maximum of an additional 12 points for Small Local Business Enterprise (SLBE) or Emerging Local Business Enterprise (ELBE) participation, to the proposer's subtotal maximum evaluation points. Additional points will be awarded as follows to achieve the proposer's final maximum evaluation points: a. If the proposer achieves 20% participation, apply 5 points to the proposer's score; or b. If the proposer achieves 25% participation, apply 10 points to the proposer's score; or c. If the prime consultant is a SLBE or an ELBE, apply 12 points to the proposer's score. The final maximum evaluation points including SLBE/ELBE is 112. The method of Contractor Selection has not been determined at this time.

Details

Division 01 - General Requirements.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties.
Division 11 - Equipment.
Division 13 - Special Construction.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 25 - Integrated Automation.
Division 26 - Electrical.
Division 27 - Communications.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents