Similar Projects
New Police Facility - City of Pullman
New Construction, Infrastructure
Conception
$8,250,000 CJ est. value
Pullman, WA 99164

Fire Station 3 - City of Pullman
New Construction, Infrastructure
Conception
$6,500,000 CJ est. value
Pullman, WA 99163

RFQ D/B - Construction of ARS/WSU Plant Bioscience Research Building
New Construction, Infrastructure - 113,703 SF
Post-Bid
$89,000,000 CJ est. value
Pullman, WA 99163

M and O Expansion Grading 2022
Infrastructure
Post-Bid
Pullman, WA

Pacific Avenue Safety - Midblock Crossing
Alteration
Results
$620,574 est. value

Albion Drive Roundabout Improvements
Demolition, Alteration
Results
WA

Pullman-Moscow Regional Airport - PMRA Terminal 2020
New Construction, Infrastructure
Construction
$49,000,000 CJ est. value
Pullman, WA 99163

Pullman-Moscow Regional Airport - PMRA Terminal 2020
New Construction, Infrastructure
Construction
$49,000,000 CJ est. value
Pullman, WA 99163

Pullman Regional Hospital - Patient Care Expansion
Addition, Demolition, Build-out, Infrastructure
Pending Verification
$45,000,000 CJ est. value
Pullman, WA 99163

Terminal Relocation Replacement
New Construction
Post-Bid
Pullman, WA

2022 Western Region Pavement Preservation MATOC
Alteration
Results
$300,000 to $10,000,000 est. value

Pullman-Moscow Regional Airport BP#3 All Other Work (Rebid)
Renovation
Construction
$49,000,000 CJ est. value
Pullman, WA 99163

Western Washington University Electrical Engineering & Computer Science Building
Term Contract
Post-Bid

Terre View Roundabout
Infrastructure
Results
Pullman, WA 99163

SR 26, Dusty to Colfax Add Climbing Lanes
Infrastructure
Post-Bid
$5,000,000 to $7,500,000 est. value
Lacrosse, WA 99143

Last Updated 03/06/2023 10:04 AM
Project Title

Pullman-Moscow Airport BP #4 - Polished Concrete Floor Finish

Physical Address View project details and contacts
City, State (County) Pullman, WA 99163   (Whitman County)
Category(s) Heavy and Highway, Transportation
Sub-Category(s) Airline/Passenger Terminal, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $49,000,000 [brand] Estimate
Plans Available from Construction Manager
Owner View project details and contacts
Architect View project details and contacts
Description

Hoffman Construction Company, General Contractor/Construction Manager ("GC/CM") for Terminal Relocation / Replacement Pullman-Moscow Regional Airport ("Project") being performed for Pullman-Moscow Regional Airport ("Owner") requests sub-bid proposals for Bid Package Polished Concrete Floor Finish (Rebid). A BID BOND in the form of a surety bond, cashier's check or certified check in an amount equal to five percent (5%) of the bid must be attached to bids in excess of three hundred thousand dollars ($300,000). BID BOND shall be payable to Hoffman Construction Company of Washington. Bond may be faxed providing the original Bid Bond is delivered no later than the next business day. Failure to provide BID BOND with bid shall render bid non-responsive. Elaborate proposals or the inclusion of non-essential information e.g. marketing/promotional material, safety manuals, resumes, etc. is strongly discouraged. Proposals that are materially incomplete, do not include current Questionnaire with latest year-end safety and financial information (unless previously submitted), are directed to other locations or received after the bid deadline will not be considered. This is a prevailing wage project. Owner and GC/CM are committed to promoting and stimulating the growth of minority business enterprises, women business enterprises and disadvantaged business enterprises (M/W/DBE) firms and maximizing the opportunities for state of Washington certified M/W/ESB firms to participate in the work of this project. The Pullman-Moscow Regional Airport Board has established a DBE contract goal for this contract. The Bidder/Offeror shall make good faith efforts, as defined in Appendix A, 49 CFR Part 26, to subcontract 4.7% of the dollar value of the prime contract to certified DBE firms as defined in 49 CFR Part 26. All bidders shall submit the information required with their proposal on the forms provided in the RFP. GC/CM is an equal opportunity employer and request bids from all qualified firms including disadvantaged, minority, women, disabled veterans and emerging small business enterprises. Construction began July 28, 2022.

Details

Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Coiling Doors and Grilles, Entrances and Storefronts, Windows, Special Function Windows, Security Windows, Access Control Hardware, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Directories, Signage, Telephone Specialties, Compartments and Cubicles, Toilet Compartments, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Storage Assemblies, Protective Covers, Flagpoles, Pest Control Devices, Flags and Banners, Security Mirrors and Domes.
Division 11 - Equipment, Loading Dock Equipment, Loading Dock Bumpers, Stationary Loading Dock Equipment, Portable Dock Equipment, Loading Dock Lights, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Art, Casework, Seating.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Packaged Generator Assemblies, Engine Generators, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Site Lighting, Walkway Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems, Intercommunications and Program Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Tactile Warning Surfacing, Fences and Gates.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 41 - Material Processing and Handling Equipment, Conveyors.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents