Similar Projects
New Municipal Building - Borough of Emerson
Addition, New Construction, Renovation, Infrastructure - 18,000 SF
Design
$12,000,000 CJ est. value
Emerson, NJ 07630

Y-- (MATOC) for Design-Build Construction Services
New Construction, Renovation, Demolition
Post-Bid
$500,000 to $20,000,000 est. value

Building 369 Demo/Asbestos Removal
Demolition
Post-Bid
$250,000 to $500,000 est. value

New Municipal Building
New Construction - 32,230 SF
Results
Bergenfield, NJ 07621

D/B Northeast MATOC
Results
$1,000,000 to $250,000,000 est. value

Multiple-Award Indefinite Delivery/Indefinite Quantity (IDIQ) Contract(s) for General Construction with Design/Build Capabilities
New Construction
Post-Bid
Less than $500,000,000 est. value

Access Control Point Program Design Build II -- RFI(2)
Results

Interior Restoration and Rehabilitation of the Zabriskie-Schedler House
Renovation
Post-Bid
Ridgewood, NJ 07450

Construction Services Performed on AJW-242 Unstaffed Infrastructure Sustainment (UIS) Facilities On and Off Airport Operating Areas
Results
Less than $150,000,000 est. value

Ranges Field House Barrier-Free Improvements
Renovation
Post-Bid
$190,000 CJ est. value
River Vale, NJ 07675

SB Fuels Multiple Award Task Order Contract (MATOC)
Results
Less than $349,000,000 est. value
Washington, DC

Solid Waste and Recyclable Materials Collection and Disposal Services
Term Contract
Post-Bid
Montvale, NJ 07645

Ridgewood Water New Facility
Renovation
Results
Ridgewood, NJ 07450

RFQ - 2021 Professional Services
Term Contract
Post-Bid
New Milford, NJ 07646

Construction of New DPW Facility
New Construction - 6,000 SF
Results
Hackensack, NJ

Last Updated 01/05/2023 09:41 AM
Project Title

RFQ - 2020 Zoning Board of Adjustment Engineer

Physical Address View project details and contacts
City, State (County) New Milford, NJ 07646   (Bergen County)
Category(s) Government/Public
Sub-Category(s) Misc. Buildings
Contracting Method Competitive Bids
Project Status Request for Qualifications, Construction start expected July 2020
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

For RFQ - 2020 Zoning Board of Adjustment Engineer The Borough of New Milford Zoning Board of Adjustment (the "Board") is soliciting Qualification Statements from interested individuals and/or firms for the provision of the professional engineering services on behalf of the Board. Inclusion of a position in this notice, however, does not constitute a warranty that the Board will fill the position at this time or through this process. Through a Request for Qualification ("RFQ") process, persons and/or firms interested in providing the Board with such services must prepare and submit a Qualification Statement in accordance with the procedure and schedule in the RFQ. The Board will review Qualification Statements only from those firms or individuals that submit a Qualification Statement which includes all the information required to be included as described (in the sole judgment of the Board). The Board intends to select (a) person(s) and/or firm(s) that a) possess(es) the professional, financial and administrative capabilities to provide the requested services, and b) agrees and meets the terms and conditions determined by the Board to provide the greatest benefit to the taxpayers of New Milford. The selection of Qualified Respondents is not subject to the provisions of the Local Public Contracts Law, N.J.S.A. 40A:11-1 et seq. The selection is, however, subject to the "New Jersey Local Unit Pay-to-Play Law," N.J.S.A. 19:44A-20.4 et seq. The Board has structured a procurement process that seeks to obtain the desired results, while establishing a competitive process, to assure that each person and/or firm is provided an equal opportunity to submit a Qualification Statement in response to the RFQ. The method of contractor selection has not been determined at this time.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Acoustical Ceilings, Flooring, Carpeting, Acoustic Treatment, Painting.
Division 12 - Furnishings.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents