Similar Projects
Envision AESC Battery Cell Gigafactory
New Construction, Infrastructure - 1,500,000 SF
Conception
$810,000,000 CJ est. value
Florence, SC 29506

611 E. Pine Street House Construction
New Construction, Infrastructure
Bidding
$145,400 CJ est. value
Florence, SC 29506

904 W. Sumter Street Renovations
Infrastructure
Bidding
$20,000 CJ est. value
Florence, SC 29501

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Cecil Road Water and Wastewater Extension
Infrastructure
Post-Bid
Florence, SC 29501

Clearing and Grubbing - Industrial Park East
Infrastructure
Results
SC

Navy Base Intermodal Facility Advanced Work Package project
Demolition, Infrastructure
Results

Judicial Center Monument Fountain Electric and Water Line Installation
Infrastructure
Construction
$35,525 CJ est. value
Florence, SC 29501

Judicial Center Monument Fountain Electric and Water Line Installation
Infrastructure
Construction
$35,525 CJ est. value
Florence, SC 29501

Wellsprings Health and Rehabilitation
Addition, Demolition, New Construction, Renovation, Infrastructure - 63,620 SF
Pending Verification
$15,869,014 CJ est. value
Florence, SC 29501

RFP - Engineering Consulting Services for Stormwater Masterplan
Term Contract
Pending Verification
$7,000,000 CJ est. value
Florence, SC 29506

703 Sanborn Street Renovations
Infrastructure
Bidding
$20,000 CJ est. value
Florence, SC 29501

AC Waterline Replacement on Howe Springs Road and Wildwood Drive
Infrastructure
Post-Bid
Florence, SC 29505

Roadway Rehabilitation Package 4
Infrastructure
Results
$487,367 CJ est. value
Florence, SC 29506

Roadway Improvements Projects - Group 2
Infrastructure
Bidding
$300,000 CJ est. value
Florence, SC 29506

Last Updated 01/23/2023 09:39 AM
Project Title

Water Distribution System Upgrades

Physical Address View project details and contacts
City, State (County) Florence, SC 29506   (Florence County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $2,896,529 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

**Bid Documents must be obtained directly from the Civil Engineer for this project** The City of Florence is accepting sealed bid from qualified contractors to complete upgrades to the water distribution system in Siesta Village, Williamsburg Circle, Tara Village and Grove Park. Contact AECOM at 803-740-1657

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents