Similar Projects
Mickle and Westfield Towers Boiler Room Improvements
Alteration
Bidding
Camden, NJ

Grunin Center Boiler Replacement, Thermostats, Air to Water Heat Pump Installation
Alteration
Bidding
Toms River, NJ

Heating, Ventilation and Air Conditioning Preventative Maintenance and Repair
Post-Bid
Jersey City, NJ 07305

Boiler and Associated Mechanical Equipment Maintenance
Term Contract
Post-Bid
Hoboken, NJ 07030

JB MDL Mechanical IDIQ
Results
$250,000 to $500,000 est. value
Lakehurst, NJ

Boiler Preventative Maintenance and Repairs
Results
Atlantic City, NJ 08401

Boiler Replacement, Occupancy Based Thermostats, Air to Water Heat Pump Installation
Alteration
Bidding
Toms River, NJ

Boiler Room Improvements to Mickle and Westfield Towers
Post-Bid
Camden, NJ 08105

Boiler Upgrade at Bradley Beach Elementary School
Results
Bradley Beach, NJ 07720

Slide Gate Replacement at the Lower Manasquan Pump Station
Alteration
Bidding
Farmingdale, NJ 07727

Replacement of Filter Media
Post-Bid
South River, NJ 08882

Steam Trap Replacement Project at Bergen New Bridge Medical Center
Results
Paramus, NJ 07652

Boiler Replacement at Bear Tavern Elementary School and Timberlane Middle School
Alteration
Bidding
$2,050,000 est. value
Hopewell Township, Pennington, NJ 08560

Mechanical Repairs to Municipal Fire Apparatus Authorized Pierce Repair Facility
Term Contract
Post-Bid
Camden, NJ 08102

ESIP Mechanical Package A
Results
$2,390,000 est. value
Jackson, NJ 08527

Last Updated 12/28/2021 02:29 PM
Project Title

Morris Hills High School Mechanical Replacement Project

Physical Address View project details and contacts
City, State (County) Rockaway, NJ 07866   (Morris County)
Category(s) Single Trades
Sub-Category(s) Mechanical
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $20,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project consists of the removal, replacement and installation of steam boilers, unit ventilators, mechanical units, etc. with new hydronic system and all associated automatic temperature control and other work as shown on the drawings and as specified, etc. at Morris Hills High School.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Heating Boilers.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents