Similar Projects
Emerging Environmental Requirements Acquisition (EERA)
Design
Less than $49,000,000 est. value

Emerging Environmental Requirements Acquisition (EERA)
Design
Less than $49,000,000 est. value

Quality Assurance (QA) Seeding
Post-Bid

Quality Assurance (QA) Seeding
Post-Bid

Rapid Response 6 Environmental Remediation Services
Results
Less than $80,000,000 est. value

Rapid Response 6 Environmental Remediation Services
Results
Less than $80,000,000 est. value

Z1QA--VISN Restoration and Remediation RFI
Post-Bid
Newington, West Haven, CT - Bedford, Brockton, Jamaica Plain, Northampton, Roxbury, MA - Togus, ME - Manchester, NH - Providence, RI - White River Jct, VT

13 Watrous Street Soil Remediation Project
Results
Less than $252,000 est. value
East Hampton, CT 06424

Remedial Action Operations Multiple Award Contract (RAOMAC) for Projects at Various Locations Predominately In The New England Area (Maine, Massachusetts, Connecticut, Rhode Island)
Post-Bid
$10,000 to $5,000,000 est. value

Soil Remediation Projects
Results
Fairfield, CT

Multi-Year Pond Management Program at Elise Besse Park
Term Contract
Results
Torrington, CT 06790

100 Franklin Street Brownfield Remediation
Results
Torrington, CT 06790

Remedial Soil Excavation Required at 141 Stratford Avenue
Results
Bridgeport, CT 06608

Last Updated 03/24/2021 09:57 AM
Project Title

Environmental Remediation Work Former Beaton and Corbin Site

Physical Address View project details and contacts
City, State (County) Southington, CT   (Hartford County)
Category(s) Environmental
Sub-Category(s) Wetlands/Remediation
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work consists of remediating a 1.65 acre parcel formerly occupied by Beaton and Corbin, whose operations included metal machining and metal plating. The work includes excavation and disposal of approximately 1200 cubic yards of petroleum, solvent and metal-impacted soils, removal of a 10,000 gallon underground gasoline storage tank, and a 10,000 gallon #4 fuel oil above ground storage tank.

Details

Division 02 - Existing Conditions, Environmental Assessment, Natural Environment Assessment, Water Remediation.
Division 32 - Exterior Improvements, Wetlands.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents