Similar Projects
Last Updated | 08/24/2021 08:08 AM |
Project Title | HVAC System Replacement |
Physical Address | View project details and contacts |
City, State (County) | Potlatch, ID (Latah County) |
Category(s) | Education, Single Trades |
Sub-Category(s) | HVAC, Middle/Senior High School |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Replacement of Heating, Ventilation, and Air Conditioning (HVAC) systems on the Jr/Sr High Gym which are outdated and in disrepair. The overall goal of the project is to install an HVAC System for the gym that is responsive to year-round temperature fluctuations and has system controls that integrate with the current HVAC System in the classroom areas of the Jr/Sr High School. Proposals should include the cost of installation, engineering, commissioning, and any structural issues that may need to be addressed. In addition, references and qualifications for the work should be provided. Evaluation Criteria:• Qualifications and experience of the applicant, including appropriate public works licensing and suitable references• Experience with Davis-Bacon prevailing wage reporting and requirements.• Ability to provide requested services in a timely manner (preferably prior to January 2022)• Cost - Potlatch School District is a fiscally responsible organization. |
||
Details | Middle/Senior High School, Renovation.
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |