Similar Projects
Sand Hill Road Assisted-Living Facility
New Construction, Infrastructure - 94,000 SF
Design
$23,000,000 CJ est. value
Castleton, VT 05735

Replacement of Existing Bridge 108
Demolition, New Construction, Infrastructure
Bidding
$10,000,000 CJ est. value
Pittsford, VT 05763

Replacement of Existing Bridge 108
Demolition, New Construction, Infrastructure
Bidding
$10,000,000 CJ est. value
Pittsford, VT 05763

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

FY 2022-2023 Roadway Crack Sealing
Infrastructure
Post-Bid
Bomoseen, VT

Road Maintenance Green Mountains Vermont
Term Contract
Results
Montgomery, VT 05471

Fair Haven-Orwell STP Fpav(61)
Infrastructure
Results
$2,500,000 to $5,000,000 est. value
Fair Haven, Orwell, VT

Slip Formed Concrete Curbing
Infrastructure
Construction
$200,000 CJ est. value
Rutland, VT 05701

Slip Formed Concrete Curbing
Infrastructure
Construction
$200,000 CJ est. value
Rutland, VT 05701

Demolition and Site Stabilization of Flood-damaged Residential Property
Term Contract, Demolition, Infrastructure
Bidding
$500,000 CJ est. value
Brandon, VT 05733

Paving
Infrastructure
Post-Bid
Mendon, VT 05701

Brattleboro-newfane STP 2940(1)
Infrastructure
Results
$10,000,000 to $25,000,000 est. value
Poultney, VT

Two Paving Projects
Infrastructure
Post-Bid
$200,000 CJ est. value
Goshen, VT 05733

Rutland State Airport SRE Building Project
New Construction, Infrastructure
Results
$854,920 CJ est. value
North Clarendon, VT 05759

Castleton
Infrastructure
Post-Bid
Castleton, VT 05777

Last Updated 08/18/2023 09:36 AM
Project Title

Newton Road Flood Repair

Physical Address View project details and contacts
City, State (County) Brandon, VT 05733   (Rutland County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected October 2023
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The Town of Brandon experienced heavy rainfall events during the month of July 2023 which resulted in two instances of the Neshobe River overtopping its bank in the area of the eastern end of Newton Road (Town Highway #21). Damage to the roadway includes loss of asphalt, loss of roadbed at shoulders, and depositing of alluvia from the river into driveway culverts and ditches. Contractors will provide their competitive bid to restore the road and all ancillary infrastructure to pre-event conditions, restoring the road and driveway accesses to specifications of Vermont Agency of Transportation A-76 standard for local roads and specific requirements provided further in this invitation to bid.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents