Similar Projects
Construction of a Bridge and Approaches on US 441 Bus/SR 29 Bus
Demolition, New Construction, Infrastructure
Bidding
$8,000,000 CJ est. value
Milledgeville, GA 31061

Construction of a Bridge and Approaches on US 441 Bus/SR 29 Bus
Demolition, New Construction, Infrastructure
Bidding
$8,000,000 CJ est. value
Milledgeville, GA 31061

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Pavement Evaluations for Interstate Maintenance
Alteration
Post-Bid
$25,000 est. value

Pavement Rehabilitation - Milledgeville Campus
Infrastructure
Results
Milledgeville, GA 31061

Drainage Replacement and Improvements
Demolition, Infrastructure
Bidding
$300,000 CJ est. value
Milledgeville, GA 31061

Road Reconstruction Annual Labor Contract
Term Contract
Post-Bid
GA

GVMC Milledgeville Phase 4
Infrastructure
Bidding
$150,000 CJ est. value
Milledgeville, GA 31061

Georgia War Veterans Home Site Infrastructure
New Construction, Infrastructure
Post-Bid
$700,000 est. value
Milledgeville, GA 31061

RFP Design - Harrisburg Park Revitalization and Streetscape Enhancement Project
Infrastructure
Bidding
$1,281,756 CJ est. value
Milledgeville, GA 31061

Publix #2003 & Shops - / Milledgeville
New Construction, Infrastructure - 60,387 SF
Post-Bid
$20,000,000 CJ est. value
Milledgeville, GA 31061

CGR Credit Union Financial Development / Milledgeville
New Construction, Infrastructure - 3,581 SF
Post-Bid
$762,300 CJ est. value
Milledgeville, GA 31061

Meriwether Place
New Construction, Infrastructure - 4,400 SF
Post-Bid
$20,000,000 CJ est. value
Milledgeville, GA 31061

RFQ Engineering - Professional Services for Pavilion Park Plan Development
Demolition, New Construction, Infrastructure
Post-Bid
Milledgeville, GA 31061

Last Updated 07/05/2023 08:37 AM
Project Title

Construction of West Montgomery Waterline Replacement

Physical Address View project details and contacts
City, State (County) Milledgeville, GA 31061   (Baldwin County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected September 2023
Bids Due View project details and contacts
Estimated Value $3,000,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

No submitted bid may be withdrawn after the scheduled closing time for receipt of bids for a period of sixty (60) days. All Bidders must have a State of Georgia Utility Contractor License and must employ a state "Utility Manager" certificate holder who will have oversight of all the work. The work to be done consists of furnishing all materials, equipment and labor for the construction of: For installation of approximately 500 linear feet of 2-inch water line on West Montgomery Street including taps, valves, services, replacement of 450 feet of sidewalk, and appurtenances. Project also includes abandonment of an existing water line on West Montgomery Street from N. Jackson Street to N. Wilkinson Street, Columbia Street, and N. Clarke Street including traffic control, fittings, 4-inch insert valve, and replacement of pavement. Time allotted for construction is 120 consecutive calendar days for substantial completion and 150 days for final completion. Proposals for the complete work in one general contract shall be made on the proposal form provided and shall contain prices in words and figures for the work bid on. All proposals shall be accompanied by a Bid Bond drawn in favor of the City of Milledgeville, in the amount of at least 10% of the lump sum bid for the complete work; such Bid Bond representing that the Bidder, if awarded the contract, will promptly enter into a contract and furnish Performance Bond and Payment Bond as provided by law and approved by the Attorney for the City of Milledgeville. Each bond shall be equal to 100% of the contract amount. The Bid Bond shall be forfeited to the City of Milledgeville as liquidated damages if the Bidder fails to execute the contract and provide Performance and Payment Bonds within 10 days after being notified that he has been awarded the contract. Drawings and Specifications are open to public inspection at the office of the City of Milledgeville and at the offices of Turnipseed Engineers in Augusta and Atlanta, Georgia. The difference between the deposit and the amount refunded represents the cost of reproduction. No refund will be made for documents received after 30 days or in damaged condition. The Owner reserves the right to reject any or all bids and to waive informalities.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents