Similar Projects
Fort Bragg Pressure Washing Services
Term Contract
Design
Fort Bragg, NC 28310

Pest Control Services
Term Contract
Bidding
Fayetteville, NC 28301

Pest Control Services for All Buildings
Term Contract
Post-Bid
Lexington, NC

Pest Control
Term Contract
Post-Bid
Asheville, NC 28804

Z--Facility Support Services Contract for Marine Corps Air Station, Cherry Point, NC
Results
Cherry Point, NC 28533

Parking Garage Pressure Washing Services
Results
Less than $397,800 est. value
Durham, NC

Pest Control Services at Various Brunswick County Facilities
Term Contract
Post-Bid
Bolivia, NC 28422

Campus Hills Gymnasium and Computer Room Abatement
Results
Durham, NC 27707

Latrine Services
Term Contract
Post-Bid
Fort Bragg, NC 28310

Pest Control
Term Contract
Results
Less than $86,209 est. value
Durham, NC 27702

45--8 CY Front Loader Dumpster
Post-Bid
Fort Bragg, NC 28310

FY22 Portable Toilets
Term Contract
Results
Rocky Mount, NC

45--Roll Off Dumpsters and Compactor
Term Contract
Post-Bid
Fort Bragg, NC

Portable Toilets, Showers & Wash Stations
Term Contract
Post-Bid

W--Service Contract: Portable Toilets
Post-Bid
Manteo, NC

Reported 05/29/2021 12:00 AM
Project Title

Water Treatment Program

Physical Address View project details and contacts
City, State (County) Boone, NC 28608   (Watauga County)
Category(s) Single Trades
Sub-Category(s) Service/Term Contracts
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Providing the treatment chemicals, application and control equipment, technical services, monitoring services, and application services necessary to ensure an effective water treatment program is maintained in all treated systems. Frequent communication with the HVAC shop and Steam Plant is essential for a successful treatment program. Personnel shall report to and work under the direction of University Facilities Maintenance (HVAC Supervisor and Steam Plant Supervisor). Bi-Weekly reports (Closed & Open Loops) shall be given to the Director of Facilities Operations, the HVAC Supervisor and the Facilities Maintenance Supervisor.

Details

Division 02 - Existing Conditions, Geotechnical Investigations, Subsurface Drilling and Sampling.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Windows, Hardware, Glazing.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Safety Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment, Lifts.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Air Terminal Units.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exterior Lighting.
Division 27 - Communications, Data Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 40 - Process Integration, Water Process Piping, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Conveyors, Cranes and Hoists.
Division 44 - Pollution and Waste Control Equipment, Odor Treatment Equipment, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment, Common Work Results for Water and Wastewater Equipment, Water and Wastewater Preliminary Treatment Equipment, Water and Wastewater Chemical Feed Equipment, Water and Wastewater Clarification and Mixing Equipment, Water and Wastewater Secondary Treatment Equipment, Water and Wastewater Advanced Treatment Equipment, Water and Wastewater Residuals Handling and Treatment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents