Similar Projects
HUD Nationwide Construction Inspection Services
Term Contract
Design
Less than $50,000,000 est. value

Inspect and Maintain Tarp Electrical Control Chambers and Tide Gate Monitoring Systems
Alteration
Bidding
$500,000 est. value
Chicago, IL

Large Diameter Sewer Main Rehabilitation
Infrastructure
Bidding
Chicago, IL

Catch Basin and Inlet Cleaning 2020-2021
Term Contract
Post-Bid
Mount Prospect, IL 60056

General Surveying Services
Term Contract
Post-Bid
Hoffman Estates, IL 60169

Manhole Cleaning
Results
Palos Park, IL 60464

2020 Manhole Rehabilitation
Results
$337,726 to $359,476 est. value
Elk Grove Village, IL 60007

Large Diameter Sewer Rehabilitation: 21st and Cermak
Infrastructure
Bidding
Chicago, IL 60616

Plan Review Services
Post-Bid
Oak Park, IL

2020 Sanitary Sewer Inspection and Rehabilitation
Results
Oak Lawn, IL 60453

Large Diameter Sewer Rehabilitation: Various Locations
Infrastructure
Bidding
Chicago, IL

FY21 Sanitary and Storm Sewer Closed Circuit Television (CCTV)
Term Contract
Post-Bid
Niles, IL 60714

Circle Avenue Sewer Separation Improvements
Results
Less than $4,000,000 est. value
Forest Park, IL 60130

2021 Structure Lining
Infrastructure
Bidding
Evanston, IL

Construction Management Services - Various Task Orders
Term Contract
Post-Bid
IL

Reported 07/08/2021 12:00 AM
Project Title

2021 Sanitary Sewer Inspection and Rehabilitation

Physical Address View project details and contacts
City, State (County) Tinley Park, IL   (Cook County)
Category(s) Professional Services, Sewer and Water
Sub-Category(s) Inspection Services, Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Provide all labor, equipment, and materials necessary to access, clean, inspect, and rehabilitate / repair sanitary sewers within the specified project area. Access activities include obtaining the necessary permits and permissions to gain access to the sewers, notifying the public, as well as physically accessing the site. Diversion and control of flow through the sewers may be required if flow is too high to clean, obtain a clear inspection, or successfully rehabilitate sewers. Cleaning activities include hydraulic cleaning, the removal and disposal of roots / debris, and leveling intruding taps. Accomplish inspection with a closed-circuit television (CCTV) inspection. Provide post-inspection data processing in accordance with NASSCO PACP. Pre-rehabilitation cleaning and inspection will be required for select rehabilitation areas. Rehabilitation includes chemical grouting, point repairs, and cured-in-place pipe lining. Rehabilitation includes installation of 8-in to 10-in CIPP and excavation point repairs.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents