Similar Projects
Firth Park Parking Lot Project
Bidding
Less than $100,000 est. value
Safford, AZ 85546

Annual Street and Park Concrete Contract FY20/21
Term Contract
Bidding
Prescott Valley, AZ 86314

Bellemont Access and Safety Project
Sub-Bidding
Less than $3,700,000 est. value
Flagstaff, AZ

Paving for Church Rock Industrial Park
Post-Bid
Fort Defiance, AZ

Parking Lot Asphalt Repairs
Post-Bid
Window Rock, AZ

78th Avenue Parking Lot Construction
Results
Peoria, AZ

Right Turn Lanes and Raised Median
Results
Less than $1,690,000 est. value
Lake Havasu City, AZ

The Shores North ADA/ABA- Construction of a Sidewalk
Post-Bid
Less than $25,000 est. value
Phoenix, AZ

Rehab Visitor Center Courtyard Garden And Walkways
Results
$25,000 to $100,000 est. value
AZ

Y--Painted Rock CG - ADA Concrete
Post-Bid
Phoenix, AZ 85027

Construct Sidewalks
Results
Less than $500,000 est. value
Prescott, AZ

Encanto Golf Course Parking Lot Concession
Term Contract
Post-Bid
Phoenix, AZ 85007

2-Step ADA Sidewalk Ramp Retrofit Job
Results
$2,000,000 to $6,000,000 est. value
Phoenix, AZ 85000

On Call Bicycle and Pedestrian Infrastructure Design Services
Term Contract
Post-Bid
Tucson, AZ

Palo Verde Drive Sidewalk Improvements
Results
Apache Junction, AZ 85217

Reported 04/16/2019 12:00 AM
Project Title

Navajo Nation ADA Ramps and Concrete Parking Pads Installation

Physical Address View project details and contacts
City, State (County) Chinle, Fort Defiance, Kaibito, Tuba City, Window Rock, AZ - Crownpoint, NM (Apache, Coconino (AZ) - McKinley (NM) Counties)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFP)
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description Select a feasible location to install a ramp and adjacent parking pads to allow easier access into the building; Install concrete pillar base for wooden post, construct weather resistant ramp in accordance with the 2010 ADA Standards for Accessibility Design, install concrete walk way to the parking pads; prepare area for parking pad; compact and install steel per 2010 ADA Standards for Accessibility Design, install 6” parking pad all applicable marking and signage for ADA. (Concrete must meet 3000 PSI in 28 days); include appropriate drainage and construction for each facility. All hardware and fixtures must meet ADA current standards.
Details
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents