Similar Projects
Shining Mountain Waldorf School - Master Plan - 11.6 acres
New Construction, Addition - 146,596 SF
Conception
Boulder, CO 80304

New Vista High School
New Construction
Conception
Boulder, CO 80302

Animas High School
New Construction - 50,000 SF
Design
$21,000,000 est. value
Durango, CO 81301

BCCS Expansion and Renovation
Renovation, Addition - 28,400 SF
Bidding
Henderson, CO 80640

Interior and exterior Improvements Mandalay Middle School and Warder Elementary School
Renovation
Bidding
Arvada, Westminster, CO 80021

Owners Representative Services
Post-Bid
CO

Arapahoe High School General Upgrades
New Construction
Post-Bid
Centennial, CO 80122

Notice Concerning Prequalification for Large Construction Projects
New Construction
Results
$100,000 est. value
Lakewood, CO 80215

Grant Beacon Middle School Design Build
Results
Less than $2,500,000 est. value
Denver, CO 80223

Aspen View Academy
New Construction, Addition - 21,000 SF
Construction
$2,000,000 to $2,500,000 est. value
Castle Rock, CO

New Centennial High School and Pueblo East HS
New Construction
Construction
$75,700,000 est. value
Pueblo, CO 81008

September School at Saddle Creek Subdivision
Renovation
Pending Verification
Boulder, CO 80302

Stem School And Academy Addition And Renovation
Renovation - 10,400 SF
Pending Verification
Highlands Ranch, CO 80129

Comprehensive High School 4
New Construction
Conception
Brighton, CO

Arvada West High School
New Construction
Bidding
Arvada, CO 80004

Last Updated 03/04/2022 05:50 PM
Project Title

Lesher Art Room Project

Physical Address View project details and contacts
City, State (County) Fort Collins, CO 80524   (Larimer County)
Category(s) Education
Sub-Category(s) Middle/Senior High School
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

To create a new art classroom by combining and renovating two existing administrative spaces within the school. Scope of work includes but is not limited to limited demolition combining two admin rooms (300B and 300C) into a new art classroom. Project also includes but is not limited to demolition of flooring, replacement of countertops, casework and plumbing and partial demolition of ceiling and replacement of ceilings. New LED lighting will be installed.

Details

Middle/Senior High School, New Construction.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances and Storefronts, Windows, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting and Coating, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents