Similar Projects
J--DA Tank Isolation Valve Installation at Coatesville VAMC
Post-Bid
Coatesville, PA 19320

J--Boiler Plant Maintenance Coatesville VAMC
Post-Bid
Coatesville, PA 19320

Ambulance Bay & Interior Renovations - HVAC/Mechanical
Results
West Brandywine Township, PA

H144--Coatesville and Lebanon VAMC Boiler and Chiller Water Treatment
Results
Coatesville, Lebanon, PA 17042

J045--Boiler Plant Maintenance Coatesville VAMC and Wilmington VAMC
Post-Bid
Wilmington, DE - Coatesville, PA

Removal of Existing Boilers and Installation of New Boilers and Associated Work at the Beaver Creek Elementary School
Results
Downingtown, PA 19335

H245--Boiler Safety Device Testing
Post-Bid
Coatesville, Erie, PA 19320

Oxford Library Mechanical Improvements Project
Results
$20,000 est. value
Oxford, PA 19363

H245--Boiler Safety Device Testing
Post-Bid
Wilmington, DE - Altoona, Coatesville, Erie, PA

Boiler Service/Maintenance for SEVC
Term Contract
Results
$13,800 est. value
Spring City, PA

J045--Replacement Condensate Polisher System Coatesville VA Medical Center
Post-Bid
Coatesville, PA 36C24421Q0

J045--Boiler Tune-Up Coatesville VAMC Wilmington VAMC
Results
Wilmington, DE - Coatesville, PA 19805

New Control System for Boiler
Results
Fairville, PA 17837

J044--Unrestricted Boiler Life Study at Coatesville Va Medical Center
Results
Coatesville, PA

Additions and Renovations to the Existing Administration Building - Mechanical Construction
Results
Downingtown, PA 19335

Last Updated 03/24/2020 07:07 AM
Project Title

Removal of Existing Boilers and Installation of New Boilers and Associated Work at the Downingtown East High School

Physical Address View project details and contacts
City, State (County) Exton, PA 19341   (Chester County)
Category(s) Single Trades
Sub-Category(s) Mechanical
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Base Scope of work includes but is not limited to providing all labor, materials, equipment, tools, rigging, transportation and appurtenances required to install new boilers.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Heating Boilers.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents