Similar Projects
Last Updated | 11/01/2021 09:15 AM |
Project Title | 2022 Box Culvert Replacement |
Physical Address | View project details and contacts |
City, State (County) | Slayton, MN (Murray County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Shoreline/Erosion/Drainage |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $440,182 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Remove Existing Bridge 1 Lump Sum Remove Pipe Culverts 207 Lin Ft Type SP 12.5 Wearing Course Mixture 150 Ton Aggregate Surface CL 5 430 Ton 14’x6’ Precast Box Culvert, CL I 96 Lin Ft 14’x6’ Precast Box Culvert End Section, Type I 4 Each 14’x7’ Precast Box Culvert, CL III 78 Lin Ft 14’x7’ Precast Box Culvert End Section, Type III 2 Each Aggregate Backfill (LV) 1,947 Cu Yd Rock Bedding (CV) 275 Cu Yd Quarry Run Riprap 195 Ton Erosion Control Blanket Cat 3N 2,240 Sq Yd Sediment Control Log, Type Straw 160 Lin F |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |