Similar Projects
Security Center Complex
New Construction, Renovation
Conception
Spanish Fork, UT 84660

Alpine Equipment Repair
Renovation - 4,568 SF
Design
American Fork, UT 84003

UVU Engineering Building
New Construction - 184,000 SF
Design
$93,000,000 est. value
Orem, UT 84058

Spanish Fork Community Network (SFCN) Fiber Huts Buildings
New Construction
Bidding
$3,000,000 est. value
Spanish Fork, UT

Provo WATRR Center Phase 1 Project
Post-Bid
Provo, UT 84606

Facility Repair & Renewal (FRR) (MATOC) Phase 1
Post-Bid
Less than $450,000,000 est. value
Washington, DC

Sources Sought Synopsis for United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Results
$3,000,000 to $15,000,000,000 est. value

D/B Western MATOC
Results
$1,000,000 to $70,000,000 est. value

Colmena Warehouse D
Renovation
Construction
Spanish Fork, UT 84660

Deseret Industries And Bishop Storehouse
New Construction - 51,041 SF
Construction
$5,000,000 to $10,000,000 CJ est. value
Saratoga Springs, UT 84045

Sunroc Industrial
New Construction
Pending Verification
Spanish Fork, UT 84660

Il Capo Personal Storage
New Construction - 5,709 SF
Pending Verification
$1,000,000 to $5,000,000 CJ est. value
Orem, UT 84057

Colarusso Industrial Park
New Construction
Design
Provo, UT 84601

Police East Bay Metal Building
Post-Bid
Provo, UT 84606

Access Control Point Program Design Build II -- RFI(2)
Results

Reported 06/21/2022 10:40 AM
Project Title

Snow Removal Building - City of Provo

Physical Address View project details and contacts
City, State (County) Provo, UT 84601   (Utah County)
Category(s) Commercial, Government/Public
Sub-Category(s) Misc. Buildings, Warehouse/Storage
Contracting Method Competitive Bids.
Project Status Conceptual Design, Construction Start Expected March 2026
Bids Due View project details and contacts
Estimated Value Less than $5,627,276
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Building to protect high dollar equipment that currently sits outside. Will be funded by the FAA. As of June 17, 2022, this project is currently in the FY 2023-2027 CIP. Funding for this project is allotted in the city's capital improvement plan for construction FY 2025. A firm timeline has not been established; however, construction is scheduled for Fiscal Year 2025. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.Total sq ft for project not available at this time.

Details

Misc. Buildings, New Construction, Warehouse/Storage, New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Entrances, Storefronts, and Curtain Walls, Entrances, Windows, Door Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Acoustical Ceilings, Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Signage, Flagpoles.
Division 11 - Equipment, Parking Control Equipment.
Division 12 - Furnishings.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents