Similar Projects
Hurricane and Storm Damage Risk Reduction
Term Contract
Design
$5,000,000 to $10,000,000 est. value

LA 3213: Gramercy Bridge Rehabilitation
Infrastructure
Design
$50,000,000 CJ est. value
Vacherie, LA 70090

Henry Road Safety Widening: LA 73 To Tillotson and Aikens Road Clearing and Grubbing
Infrastructure, Alteration
Post-Bid
$350,000 to $500,000 est. value

Rehabilitation of several existing roads in Washington Parish
Infrastructure
Post-Bid

West Shore Lake Pontchartrain, Bottomland Hardwood, Louisiana Project, CEMVN
Term Contract
Results
$10,000,000 est. value

Dr 4263 Pw 910 Paved Roads - Task Order No. 4
Infrastructure
Results
$4,500,000 est. value

Formosa Plastics Sunshine Project
New Construction, Infrastructure
Pending Verification
$12,000,000,000 CJ est. value
Saint James, LA 70086

Formosa Plastics Sunshine Project
New Construction, Infrastructure
Pending Verification
$12,000,000,000 CJ est. value
Saint James, LA 70086

LA 70: Sunshine Bridge Emer Truss Repair
Infrastructure
Design
$500,000 CJ est. value
Saint James, LA 70086

Asphaltic Concrete Pavement Preservation 2022-2023
Infrastructure
Post-Bid
Convent, LA

M/V New Roads - 2021 Uscg Drydock
Infrastructure
Results
$1,000,000 to $2,500,000 est. value

Loc Rd Over Borrow Pit(Blind Rv Bt Lnch)
Demolition, New Construction, Infrastructure
Design
$1,000,000 CJ est. value
Convent, LA 70723

Water oak Drainage
Alteration
Post-Bid
$17,140 est. value
Slidell, LA 70458

David Plantation Subdivision Drainage Improvements
Infrastructure
Results
$1,000,000 est. value
Convent, LA

Buddy Whitney Canal Drainage Improvements
Infrastructure
Post-Bid
$300,000 est. value
Convent, LA

Last Updated 12/09/2022 11:36 AM
Project Title

Laurel Ridge Levee Extension

Physical Address View project details and contacts
City, State (County) Lutcher, LA 70071   (Saint James County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Shoreline/Erosion/Drainage, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $3,000,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Construction of the extension of the existing Laurel Ridge Levee near Gold Place Rd to the north approximately 4.5 miles to Walls Cemetery Road. The levee includes seven gated control structures, an emergency overflow structure, several ramps, and levee-top aggregate roadway construction. Where bids are to be received or forms furnished by the awarding authority, no contract documents shall be issued to anyone except a Licensed Contractor or his authorized Representatives. In no event shall any documents for bidding be issued later than twenty-four (24) hours prior to the hour and date set for receiving bids. The public entity advertising for bids for work requires the bidders to attach bid security in the form of a bid bond, a certified check, or cashier's check for not more than five percent of the estimated price of supplies or materials, as evidence of good faith of the bidder as prescribed by La R.S. 38: 2218(A). It will be the responsibility of the bidder to check for updates. All submitted questions will be forwarded by email to the Project Manager and the Project Engineer for a response. Contractors desiring to bid shall submit to the Engineers, with their request for Contract Documents, contract documents deposit and evidence that they hold State License in HEAVY CONSTRUCTION (Earthwork, Drainage and Levees), is in full force and effect. In accordance with LA R.S. 38:2227 and LA R.S. 38:2212.10, each bidder on this project must submit other required documents identified in the contract documents to Pontchartrain Levee District (PLD), (Mailing Address) P.O. Box 426, Lutcher, LA 70071 or (Physical Address) 2069 Railroad Ave. Lutcher, LA 70071 within 10 days after the opening of bids. Bid security in the amount of five percent (5%) of the Total Bid must accompany each Bid and shall be made payable to the Owner in the form of a bid bond, a certified check, or cashier's check as prescribed by La R.S. 38: 2218(A). Each Bidder must deposit with his/her bid, security in the amount, for and subject to the conditions provided in the Information for Bidders. Sureties used for obtaining bonds must appear as acceptable on the U.S. Department of Treasury Circular 570. Pursuant to La R.S. 38:2212 (B)(1), the provisions of La R.S. 38:2212 (B)(1) and the bidding documents shall not be waived by any entity. Pursuant to La. R.S. 38:2214 (C) Bids containing patently obvious, unintentional, and substantial mechanical, clerical, or mathematical errors, or errors of unintentional omission of a substantial quantity of work, labor, material, or services made directly in the compilation of the bid, may be withdrawn by the contractor if clear and convincing sworn, written evidence of such errors is furnished to the public entity within forty-eight (48) hours of the bid opening excluding Saturdays, Sundays, and legal holidays. Such errors must be clearly shown by objective evidence drawn from inspection of the original work papers, documents, or materials used in the preparation of the bid sought to be withdrawn. If the public entity determines that the error is a patently obvious mechanical, clerical, or mathematical error, or unintentional omission of a substantial quantity of work, labor, material, or services, as opposed to a judgment error, and that the bid was submitted in good faith it shall accept the withdrawal and return the bid security to the contractor. . Electronic bids shall include Uniform Bid Form, Bid Bond and Corporate Resolution and must be submitted through electronically.To address the above requirement for electronic bids the Pontchartrain Levee District will allow electronic bids submitted via the PLD approved on-line bid site to be submitted as follows: A. A copy of the bid bond and corporate resolution must be attached to bid document submitted electronically. Seals for on-line submittals shall be stamped. B. The original bid bond and corporate resolution documents must be received in our office no later than 48 hours after bid opening date and time (Pontchartrain Levee District at McKim & Creed, Inc., 1022 South Purpera Ave., Gonzales, LA 70737). C. The bid bond and corporate resolution envelope must be clearly labeled as a Bid Bond/Corporate Resolution with the project name, vendors name as it appears on the bid documents and address. Deposits on the first set of Documents furnished to bona fide Prime Bidders, properly licensed by the Louisiana State Licensing Board of Contractors, will be fully refunded upon return of the documents in original condition and no later than ten (10) days after receipt of Bids. On other sets of documents furnished to said Prime Bidders, the deposit less actual cost of reproduction will be refunded upon return of the documents in original condition and no later than ten (10) days after receipt of bids. No refund will be made to non-bidders or sub-bidders.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 34 - Transportation, Operation and Maintenance of Transportation.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents