Similar Projects
Joy's Pond Outlet Culvert Replacement Contract
Infrastructure
Bidding
$300,000 CJ est. value
Whitefield, ME 04353

Long Pond Water Access Reconstruction
Infrastructure
Bidding
$140,000 CJ est. value
Jefferson, ME 04348

2022 Hot Mix Asphalt (HMA) Paving Bid Blinn Hill
Infrastructure
Post-Bid
$200,000 est. value
Dresden, ME

2022 Road Paving
Infrastructure
Post-Bid
$278,897 est. value
Whitefield, ME

Concrete Bridge Wearing Surface Replacement
Results
Dresden, ME 04342

Repaving Cross Road
Infrastructure
Results
Alna, ME 04535

Wiscasset Road New Dental Office
Demolition, New Construction, Infrastructure
Pending Verification
$600,000 CJ est. value
Boothbay, ME 04537

Wiscasset Road New Dental Office
Demolition, New Construction, Infrastructure
Pending Verification
$600,000 CJ est. value
Boothbay, ME 04537

Hot Topping
Infrastructure
Post-Bid
Nobleboro, ME

ACAD- Repair Storm Damaged Bike Paths
Term Contract
Results
$25,000 to $100,000 est. value

Atlantic Highway Boat Storage and Self-Storage
New Construction, Infrastructure - 7,200 SF
Pending Verification
$800,000 CJ est. value
Waldoboro, ME 04572

Statewide Geotechnical Drilling
Infrastructure
Results

Boothbay Solar
Infrastructure
Pending Verification
$50,000 CJ est. value
Boothbay, ME 04537

2021 HMA Paving Services
Infrastructure
Results
Dresden, ME 04342

Clippership Landing Nursing Care Facility
New Construction, Infrastructure - 74,500 SF
Pending Verification
$45,000,000 CJ est. value
Damariscotta, ME 04543

Last Updated 02/17/2023 06:01 AM
Project Title

Davis Number One Bridge Replacement - Jefferson - Region 2

Physical Address View project details and contacts
City, State (County) Jefferson, ME 04348   (Lincoln County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Contract Award, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $1,496,111 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The lowest responsive bidder must have completed, or successfully complete, a bridge prequalification. highway prequalification, or project specific prequalification to be considered for the award of this contract. Description: Maine Federal Aid Project No. 2309200 WIN 023092.00 Location: In Lincoln County, Davis Number One bridge is located on State Route 17/ Rockland Road over Brann Brook approximately 0.51 of a mile easterly of State Route 32. Scope of Work: Davis Number One bridge replacement plus other incidental work. For general information regarding Bidding and Contracting procedures, contact George Macdougall at (207) 624-3410. For Project-specific information fax all questions to Project Manager Brian Nichols at (207) 624-3431, use electronic RFI form or email questions to RFI- Contracts. MDOT@maine.gov, project name and identification number should be in the subject line. Questions received after 12:00 noon of Monday (or if that Monday is a state holiday, Friday) prior to bid date will not be answered. Bidders shall not contact any other Departmental staff for clarification of Contract provisions, and the Department will not be responsible for any | interpretations so obtained. TTY users call Maine Relay 711. Each Bid must be made upon blank forms provided by the Department and must be accompanied by a bid bond at 5% of the bid amount or an official bank check, cashier's check, certified check, certificate of deposit, or United States postal money order in the amount of 5% of the bid amount, payable to Treasurer, State of Maine as a Bid guarantee. A Contract Performance Surety Bond and a Contract Payment Surety Bond, each in the amount of 100 percent of the Contract price, will be required of the successful Bidder. This Contract is subject to all applicable Federal Laws. This contract is subject to compliance with the Disadvantaged Business Enterprise program requirements as set forth by the Maine Department of Transportation. The right is hereby reserved to the MaineDOT to reject any or all bids. MEDOT - Davis Number One Bridge Replacement - Jefferson - Region 2 We now accept electronic bids for bid packages posted on the website. Electronic bids do not have to be accompanied by paper bids. Please note: The Department will accept a facsimile of the bid bond; however, the original bid bond must then be received at the MDOT Contract Section within 72 hours of the bid opening, Until further notice, dual bids (one paper, one electronic) will be accepted, with the paper copy taking precedence.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents