Similar Projects
2020 Water and Sewer Maintenance Supplies
Post-Bid
Fremont, OH 43420

Water Main Pipes, Fittings, Valves and Related Supplies
Post-Bid
Dayton, OH

Seneca, Ononta Water Main Replacement
Results
Cincinnati, OH

C Water Main Renewal
Results
Cleveland, OH

Waterline Replacement, Phase 3.1
Post-Bid
Less than $80,000 est. value
Columbus, OH

Tower Avenue Water Main (Washington Avenue to Franklin Avenue)
Results
Less than $161,159 est. value
Saint Bernard, OH

Clinton Street Waterline Replacement
Post-Bid
Bloomville, OH

South Roosevelt Avenue Water Main Improvements
Results
Less than $1,850,000 est. value
Bexley, OH

Northridge MIU Installation and Water Meter Exchange
Results
Springfield, OH 45501

Selwyn Road Resurfacing and Waterline Replacement
Results
$1,478,691 est. value
Cleveland Heights, OH 44118

Waterline Construction
Results
$25,000 to $100,000 est. value
Lewis Center, OH 43035

Olive Street 8-Inch Waterline Replacement
Results
Less than $130,000 est. value
Findlay, OH 45840

Water Supply Line
Results
Toledo, OH 43604

Water Main Replacement from 2133 to 2243 Hamilton - Cleves Road
Results
Less than $196,000 est. value
Hamilton, OH 45011

Repair, Replace, and Maintain Various Types of Valves, Actuators, and Appurtenances
Results
Cleveland, OH

Last Updated 01/27/2021 03:54 PM
Project Title

Rebuild Test Structures at Lima, OH

Physical Address View project details and contacts
City, State (County) Lima, OH 45801   (Allen County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,000,000 to $5,000,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

DESCRIPTION: The U.S. Army Corps of Engineers (USACE) Louisville District intends to issue an Invitation for Bid (IFB) W912QR20B0019 Rebuild Test Structures at Lima, OH. This project includes a Construction of a new concrete mobility test slope and water fording pit. The new concrete mobility test slope will be pyramid shaped, 108'-7” long by 80' wide with a 20' wide center path that has a steep slope on each side, and on the 2 opposite sides a shallower slope to traverse and approximately 24’ high on the top. New water fording pit will be 152' long, 26'-6” wide, with a 16' wide path for tanks to traverse, and an 8'-10" wide walking path next to the fording pit. Construction of new access drives and access pavement, new grading and drainage, new 8" domestic water supply to a new hydrant and 6" water supply and new sanitary sewer with oil separator at the fording pit. Installation of immersion electric water heaters for the water fording pit ice control. Existing service utilities are anticipated to be utilized for new structures. Demolition of existing water fording site and concrete mobility test slope. Limited existing steam line utility and supporting structures demolition.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents