Similar Projects
Last Updated | 04/27/2023 12:38 PM |
Project Title | Prince William Forest Park Replace 5 Trail Bridges |
Physical Address | View project details and contacts |
City, State (County) | Triangle, VA 22172 (Prince William County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Bridge, Site Development |
Contracting Method | Competitive Bids |
Project Status | Bidding, Construction start expected June 2023 |
Bids Due | View project details and contacts |
Estimated Value | $4,000,000 [brand] Estimate |
Plans Available from | Plan Holders |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | This purpose of this project is to remove five (5) existing old trail bridges and install five (5) new trail bridges on five (5) different hiking trail locations inside the park. The new trail bridges have already been purchased, assembled, and are stored at the park's maintenance facility. They need to be installed at their individual locations by the contractor as designated by the park. The contractor shall provide all labor, supervision, transportation, materials, tools, equipment, and ancillary services necessary to execute the tasks specified in this the scope of work and any of its attachments. Structural & Civil Engineering: o VA PE Stamped Design & Calculation Package for the Bridges o VA PE Stamp Design & Calculation Package for the Abutments/Anchors Bridge 1 - S. Valley Trail at Lot C Access: o Qty (1) Pedestrian Bridge o Weathering Steel Bridge o Pratt Truss Configuration o 90 PSF Live Load o PT Pin(R) Decking o Horizontal Railing o Freight to project site Our estimate below defines our full scope of work as a turn-key solution for the pedestrian bridges on the project. Bridge Brother's scope will include all structural & civil engineering associated with the bridges and foundations and issue a PE stamped design package, In addition, Bridge Brothers will handle all site construction associated with the bridges, manufacturing of the bridges, and onssts erection of the bridges. The bridge structures and all associated designs will be in adherence to AASHTQ design guide for bridge structures. See below for further breakdown of our scope of o Site Construction proposal could change based on Geotechnical Report, Site Survey, and Site Constraints o Site Grading for Bridge Footings o Geotechnical report and site survey needed (by others) o Form and Pour Bridge Foundations (Assumed no more than 6' tall) o Rip-rap, piles, dewatering and wingwails excluded Piles estimated o Backfill Bridge Foundations o *Ciear Access to both sides is required o Unload and Splice Fit-Up Bridges o Erect Bridges & Install Bridge Anchors |
||||||||||||||||||||
Details |
|
||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |