Similar Projects
General Engineering (A License) Construction, San Francisco, San Mateo, Santa Clara, and Alameda Counties
Infrastructure, Alteration
Results
$5,000,000 est. value

Downtown Visalia Streetlights and Paving Project
Infrastructure, Alteration
Post-Bid

Concrete Materials
Alteration
Post-Bid
$250,000 to $1,000,000 est. value
Oakland, CA

Repair of Damaged and Displaced Sections of Curbs, Gutters, and Sidewalks, Unit No. 28
Infrastructure
Post-Bid
$98,000 CJ est. value
Hayward, CA 94545

Fruitvale Land Crossing Bay Trail
Infrastructure
Results
$875,000 CJ est. value
Oakland, CA 94601

Hildebrand Hall Building Management Systems Renewal Re-Bid
Renovation
Results
$2,697,421 CJ est. value
Berkeley, CA 94704

Trash Capture Device Installation on Tennyson Road Project
Infrastructure
Post-Bid
$964,000 CJ est. value
Hayward, CA 94544

Accessible Improvement Program Phase 2
Infrastructure
Results
$10,139,875 CJ est. value
Oakland, CA 94612

Municipal Parking Lot No. 8 Improvement Project
Infrastructure
Results
$737,888 CJ est. value
Hayward, CA 94541

Student Center Interim Project - 2nd Floor Flooring, ReBid
Renovation
Results
$125,000 CJ est. value
Oakland, CA 94607

Mosswood Community Center
New Construction, Infrastructure - 12,193 SF
Results
$21,204,621 CJ est. value
Oakland, CA 94611

Augustin Bernal Mountain Bike Trail
Infrastructure
Results
$265,217 CJ est. value
Pleasanton, CA 94566

Polymeric Concrete Vault Boxes, Meter Boxes, and Covers
Term Contract
Post-Bid
Oakland, CA 94612

Washington Avenue Reconstruction Project
Infrastructure
Results
$1,767,337 CJ est. value
San Leandro, CA 94578

DM FY20 Weill Hall Mechanical and Electrical
Renovation
Results
$10,603,558 CJ est. value
Berkeley, CA 94720

Last Updated 05/01/2023 02:03 AM
Project Title

Roosevelt Middle School Modernization - Interim Housing Increment 1 and Science Modular Building Increment 1

Physical Address View project details and contacts
City, State (County) Oakland, CA 94606   (Alameda County)
Category(s) Single Trades
Sub-Category(s) Concrete
Contracting Method Competitive Bids
Project Status Contract Award, Request for Qualifications, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $2,980,800 [brand] Estimate
Plans Available from Copy Center - 02/15/23
Owner View project details and contacts
Architect View project details and contacts
Description

The Scope of work to include but not limited to exterior building pad preparation includes asphalt paving, grinding existing asphalt, demolition, trenching, sewer & water site utilities and installation of utility boxes and underground conduits excluding conductors. The scope will prepare the site for a future project scheduled Winter 2024 Engineer's Estimate: $1,500,000 Bids must be accompanied by a bidder's bond, cashier's check, or certified check for at least ten percent (10%) of the amount of the base bid and made payable to the Owner, as detailed in the Contract Documents. Pursuant to the Contract Documents, the successful bidder will be required to furnish a Payment (Labor and Material) Bond in the amount of one hundred percent (100%) of the Contract Sum, and a Faithful Performance Bond in the amount of one hundred percent (100%) of the Contract Sum The Contract Time shall be 67 calendar days, and liquidated damages for delay shall accrue. The deadline for Completion is TBD.

Details

Division 03 - Concrete, Cast-in-Place Concrete.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents