Air Park Recreation Center Replacement Facility - City of Lincoln
Addition, Infrastructure
Conception
$933,182 CJ est. value
Lincoln, NE 68524

Multi Modal Center - City of Lincoln
New Construction, Infrastructure
Conception
$528,979 CJ est. value
Lincoln, NE 68508

Compressed Natural Gas (CNG) Fueling Station
New Construction, Infrastructure
Design
$4,481,919 CJ est. value
Lincoln, NE 68508

Monolith Materials Anhydrous Ammonia Plant - Phase 2
Addition, Demolition, Renovation, Infrastructure
Design
$1,000,000,000 CJ est. value
Hallam, NE 68368

Wyuka Cemetery Pond and Drainageway Improvements
Infrastructure
Bidding
$500,000 CJ est. value
Lincoln, NE 68510

1CCC 1st Addition Infracstructure Improvements
Addition, Infrastructure
Bidding
$547,000 CJ est. value
Lincoln, NE 68528

Arnold Heights Concrete - 2022
Infrastructure
Post-Bid
$30,000 CJ est. value
Lincoln, NE 68508

Southeast Community College Healing Gardens Lincoln Campus
Infrastructure
Post-Bid
$200,000 CJ est. value
Lincoln, NE 68508

MSC Site Improvement
Infrastructure
Results
$600,000 est. value
Lincoln, NE

Reception and Treatment Center Exterior Repairs - Phase II
Addition, Demolition, Renovation, Infrastructure
Results
$1,373,246 CJ est. value
Lincoln, NE 68510

Southeast Community College Residence Hall - Lincoln Campus
New Construction, Infrastructure - 89,780 SF
Construction
$25,000,000 CJ est. value
Lincoln, NE 68520

South 59th Circle Mixed-Use / Lincoln
New Construction, Infrastructure - 130,000 SF
Pending Verification
$60,000,000 CJ est. value
Lincoln, NE 68516

17th & Holdrege Transformer #2 - SUB410 - City of Lincoln
New Construction, Infrastructure
Pending Verification
$3,204,000 CJ est. value
Lincoln, NE 68508

20th & Pioneers Substation Replace Transformer - 0693 - City of Lincoln
New Construction, Infrastructure
Conception
$1,064,000 CJ est. value
Lincoln, NE 68502

New Central Library - City of Lincoln
New Construction, Infrastructure
Design
$45,000,000 CJ est. value
Lincoln, NE 68508

Last Updated 07/24/2023 04:18 PM
Project Title

Residence Inn / Lincoln

Physical Address View project details and contacts
City, State (County) Lincoln, NE 68508   (Lancaster County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Hotel/Motel, Site Development
Contracting Method Bids by Invitation
Project Status Bidding, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $25,000,000 [brand] Estimate
Plans Available from Selected Bidders
Owner View project details and contacts
Architect View project details and contacts
Description

The project is an approximately 83,000 square-foot new hotel building. 6 stories total with post-tension concrete podium and 5 levels of wood framing above the podium. Construction is scheduled to begin in June 2023. Please reference the responsibility Matrix located on Sheet A001 for items that are Owner Furnished and/or Owner installed. Questions about this project can be referred to brian.grimes@sampson-construction.com or by phone at 402-434-5419 *It should be noted that this bid set of documents are not 100% complete, although very close to complete, and Sampson Construction - Lincoln encourages questions from bidders as bids are prepared. Sampson Construction - Lincoln is asking bidders to rely on their expertise to offer comments/clarifications to help fill in the gaps in the bid documents.

Details

6 Stories Above Grade, 83,000 SF.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Structural Concrete, Precast Concrete Slabs.
Division 04 - Masonry, Unit Masonry, Concrete Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances and Storefronts, Windows, Mirrors.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Flooring, Resilient Flooring, Carpeting, Wall Coverings, Acoustic Treatment, Painting.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Flagpoles.
Division 11 - Equipment, Commercial Laundry and Dry Cleaning Equipment, Maintenance Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Window Blinds, Curtains and Drapes, Casework, Furnishings and Accessories, Hospitality Furniture.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Medium-Voltage Electrical Distribution, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Voice Communications, Call Management.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents