Similar Projects
Tremont Fountain Improvements
Bidding
Upper Arlington, OH 43221

Water Meter Back Flow Preventer
Post-Bid
Less than $1,380,000 est. value
Columbus, OH

Multiple Building Chiller Replacements
Post-Bid
Less than $1,200,000 est. value
Columbus, OH

Domestic Water Heater Replacement
Results
Reynoldsburg, OH

J--Cooling Towers - Refurbish/Repair
Results
Columbus, OH 43219

Boiler Controls
Post-Bid
Columbus, OH

DEV-Emergency Repair
Results
Columbus, OH

Boiler Repair Service
Post-Bid
Columbus, OH

Boiler Replacement
Results
$2,140,197 est. value
Columbus, OH

FCBDD 2021 ECLC Boilers Replacement
Post-Bid
$115,000 est. value
Columbus, OH 43214

Project CSC-20082 Overhaul AFD on Existing Chillers, Building 23 at DSCC in Columbus, OH, FH 20
Results
Columbus, OH 43218

DOW OPS - 2.5 Gallon Electric Water Heaters
Post-Bid
Columbus, OH

RPAC-Heating Hot Water Renovation
Results
Less than $662,000 est. value
Columbus, OH

Boiler Replacement at North High School
Results
Less than $669,200 est. value
Westerville, OH 43081

Boiler Inspections New Buildings
Results
Columbus, OH

Last Updated 02/13/2020 04:28 PM
Project Title

Fawcett - Boiler Replacement

Physical Address View project details and contacts
City, State (County) Columbus, OH   (Franklin County)
Category(s) Single Trades
Sub-Category(s) Mechanical
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $572,700
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Perform hazardous material abatement for Heating Hot Water work - piping, equipment,etc. Remove (2) existing heating hot water boilers, all associated piping, pumps, etc. One 2,000 MBH existing condensing-type AERCO boiler will remain and be incorporated into the new boiler plant. Remove existing 3-way mixing valve in secondary heating water piping loop. Furnish and install 3 new AERCO high efficiency condensing type natural gas-fired boilers on new housekeeping pad. Complete installation of new boilers with associated piping, inline pumps, flue, combustion air piping, air/dirt separator, etc., and place into operation. Modify existing Johnson Controls Building Automation System to provide monitoring of new boiler plant, to enable boiler plant, and to reset supply water temperature. Provide power for all new boilers and pumps. Two of each will be fed from emergency power and one will be fed from normal power.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Heating Boilers, Heating Boiler Feedwater Equipment, Boiler Feedwater Pumps.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents