Similar Projects
Last Updated | 09/16/2022 03:35 AM |
Project Title | Service Center Roof Recover and DD Building Roof Replacement |
Physical Address | View project details and contacts |
City, State (County) | Hudson, WI 54016 (Saint Croix County) |
Category(s) | Single Trades |
Sub-Category(s) | Roofing |
Contracting Method | Competitive Bids |
Project Status | Sub-Bidding, Construction start expected November 2022 |
Bids Due | View project details and contacts |
Estimated Value | $200,000 [brand] Estimate |
Plans Available from | Civil Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | A Service Center Roof Recover and DD Building Roof Replacement Project at two separate municipal facilities (Service Center Building and DD Building), located at 1752 Dorset Lane and 1525 N 4th Street, New Richmond, Wisconsin. Roof Recover at Service Center Building (Base Bid No. 1), consists of: Removal and legal disposal of existing sheet metal flashings, gutters, downspouts, abandoned curbs/equipment, and perimeter fall protection system; Removal and salvage of existing roof hatch guardrail system, and safely store for re-installation; Provide wood blocking; Provide 3-1/4-inch EPS profile-cut flute fill insulation; Provide 1-inch polyisocyanurate insulation, mechanically-attached to existing metal roof panels; Provide 1/2-inch cover board adhesively attached to underlying insulation; Provide 60-mil EPDM single-ply roof membrane, fully-adhered; Provide sheet metal, guard rail system, and related Work. Roof Replacement at DD Building (Base Bid No. 2), consists of: Removal and legal disposal of existing roof systems, sheet metal flashings, abandoned equipment and curbs; Provide 1/2-inch thermal barrier, mechanically-attached to existing metal roof deck; Provide self-adhered vapor retarder; Provide tapered polyisocyanurate insulation, adhesively attached; Provide 1/2-inch cover board adhesively attached to underlying insulation; Provide 60-mil EPDM single-ply roof membrane, fully-adhered; Provide roof access ladders, roof hatch, and guard rail system; Provide sheet metal and related Work. Your offer will be required to be submitted under a condition of irrevocability for a period of 60-days after submission. Simultaneously with the delivery of the signed Contract, Bidder shall be required to furnish a 100 - percent Performance-Payment Bond. Owner reserves the right to accept or reject any or all offers. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |