Similar Projects
North Side Energy Center
New Construction, Infrastructure
Conception
$267,611,000 CJ est. value
Brasher Falls, NY 13613

Massena Green Hydrogen Facility
New Construction, Infrastructure
Conception
$500,000,000 CJ est. value
Massena, NY 13662

Massena airport rehabilitating entire main runway
Infrastructure
Design
Massena, NY 13662

Massena airport rehabilitating entire main runway
Infrastructure
Design
Massena, NY 13662

Provide Salt Storage Building- Cranberry Lake - Construction Work
New Construction, Infrastructure
Post-Bid
$1,000,000 CJ est. value
Cranberry Lake, NY 12927

Electrical Work Provide Salt Storage Building - Cranberry Lake
New Construction, Infrastructure
Post-Bid
$100,000 CJ est. value
Cranberry Lake, NY 12927

Hostels 1892 and 1893 Driveway and Parking Replacement
Infrastructure
Results
$300,000 to $350,000 est. value
Keeseville, Massena, NY 13662

Sidewalk Improvements - Phase 2
Infrastructure
Results
$600,000 CJ est. value
Norfolk, NY 13667

Pavement Improvement Project
Infrastructure
Construction
$680,716 CJ est. value
Canton, NY 13617

Meade Road Solar Project
New Construction, Infrastructure
Pending Verification
$1,000,000 CJ est. value
Canton, NY 13617

Seaway Visitor Center
New Construction, Infrastructure - 7,500 SF
Pending Verification
$8,400,000 CJ est. value
Massena, NY 13662

County Road 22 Bridge Replacement - St. Lawrence County
Demolition, New Construction, Infrastructure
Conception
$2,031,000 CJ est. value
Gouverneur, NY 13642

RT 58 / Chippewa Creek
Demolition, New Construction, Infrastructure
Design
$2,200,000 CJ est. value
Gouverneur, NY 13642

Ogdensburg Transfer Station Improvements
New Construction, Renovation, Infrastructure
Post-Bid
$600,000 CJ est. value
Ogdensburg, NY 13669

Main Street Pump Station Rehabilitation
Renovation, Infrastructure
Results
$1,492,425 CJ est. value
Ogdensburg, NY 13669

Last Updated 09/29/2023 01:35 AM
Project Title

Replacement of Lazy River Road Bridge over Grasse River

Physical Address View project details and contacts
City, State (County) Hermon, NY 13652   (Saint Lawrence County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected November 2023
Bids Due View project details and contacts
Estimated Value $752,500 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

(2023-36) Replacement of Lazy River Road Bridge over Grasse River PIN 7753.32 BIN 3341820 The work includes providing all labor, materials, machinery, tools, equipment and other means of construction necessary and incidental to the completion of the work shown on the Plans and described in these Specifications including, but not necessarily limited to the following: The removal and replacement of the existing bridge carrying Lazy River Road over the Grasse River on a new horizontal and vertical roadway alignment. The existing bridge will be removed in its entirety and replaced with a 170-foot long multiple steel girder superstructure with a composite concrete deck. The superstructure will be supported on semi-integral abutments on driven steel H-piles to refusal. The bridge and approach roadway will consist of 10'-0" travel lanes and 4'-0" shoulders. Approximately 850 linear feet of approach highway reconstruction will be required to tie the new bridge into the adjacent roadway alignment. New box beam guide railing will be installed on the bridge and onto the approaches. Traffic will be maintained on an off-site detour during construction Each bid must be accompanied by security in an amount not less than five percent (5%) of the amount of the Bid in the form and subject to the conditions provided in the Information For Bidders. The Bidder to whom the Contract is awarded will be required to furnish Performance, Payment and Guarantee Bonds from an acceptable Surety Company for an amount not less than 100% of the accepted bid. The DBE goal for this project is 4%. Questions regarding the Contract Documents should be directed to Bids@stlawco.gov within 7 days of Bid opening. The County reserves the right to consider the bids for forty-five (45) days after receipt before awarding any contract, and to waive any minor informalities in, and to reject, any and all bids.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents