Similar Projects
Weber State Davis Campus Access Road
Post-Bid
Layton, UT 84041

New Parking Lot and Elevated Parking Deck Adjacent to City Hall
Post-Bid
Saint George, UT 84770

DDHU Lot 3 Repairs at Hill AFB, UT
Results
$5,000,000 to $10,000,000 est. value
Ogden, UT 84056

DDHU Lot 3 Repairs at Hill AFB, UT
Results
$5,000,000 to $10,000,000 est. value
Ogden, UT 84056

Improvements and Construction of Approximately 5.2 Miles of Road
Construction
UT

US-89; I-215 to 4300 South Preservation High Volume
Post-Bid
$3,000,000 to $4,000,000 est. value
UT

Y--Take Out Beach Parking Lot Expansion
Results
$400,000 to $600,000 est. value
Moab, UT 84532

The Inn Between Cement Walkway
Post-Bid
Salt Lake City, UT 84105

Redwood Road 4100 South to 5400 South
Results

3200 West; 10431 South to 10600 South Reconstruct Widening
Post-Bid
$500,000 to $1,500,000 est. value
UT

Crack Sealing and Seal Coating
Results
Park City, UT

Lot 4 at Hill AFB into a Fenced Material Storage Area.
Post-Bid
$5,000,000 to $10,000,000 est. value
UT

2019 Roadway Improvement Projects
Results
Midvale, UT

I-80; Wanship to Echo Preservation High Volume
Post-Bid
$1,500,000 to $300,000 est. value
UT

1700 South, 600 East Bike Lane, School Crosswalk Enhancements
Results
Less than $84,895 est. value
Salt Lake City, UT 84111

Reported 03/25/2020 12:00 AM
Project Title

Sand Flats Office Concrete Driveways and ADA Parking

Physical Address View project details and contacts
City, State (County) Moab, UT 84532   (Grand County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

This project includes replacing curb, gutter and apron on west side property driveway and constructing new curb, gutter and apron on east side driveway all per Moab City and APWA standards. Driveways will be 24 feet long and 12 feet wide. Project also includes concrete ADA parking and access aisle for one vehicle and replacing eight sidewalk panels. Contractor is responsible for E & E contract permit from Moab City Public Works. Project also includes working with steel fabricator to install footers and weld plates provided for stairs and ADA ramp.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents