Similar Projects
108-120 Baxter Road Sewer Design And Construction - SEWER-17-001 - Town & County of Nantucket
Infrastructure
Conception
$10,000,000 CJ est. value
Nantucket, MA 02564

Madaket/Warrens Landing/Somerset Sewer - SEWER-19-001 - Town & County of Nantucket
Infrastructure
Conception
$52,400,000 CJ est. value
Nantucket, MA 02554

Brotherhood of Thieves - Cisco Brewers
Addition, Demolition, Infrastructure
Design
$1,000,000 CJ est. value
Nantucket, MA 02554

Sea Street Lodging House
Demolition, New Construction, Infrastructure
Design
$2,000,000 CJ est. value
Nantucket, MA 02554

Workforce Affordable Rental Housing Development at 135 & 137 Orange Street
New Construction, Infrastructure
Bidding
$1,000,000 CJ est. value
Nantucket, MA 02554

RFP - Waitt Drive Lots 88, 89 and 90
New Construction, Infrastructure
Bidding
$500,000 CJ est. value
Nantucket, MA 02554

Road Grading Services
Infrastructure
Post-Bid
$250,000 est. value
Nantucket, MA 02554

Nantucket Harbormaster Building - General Bid
New Construction, Infrastructure - 3,500 SF
Post-Bid
$8,915,000 CJ est. value
Nantucket, MA 02554

Relocate and Reconstruct, Mark, Light and Sign Taxiway 'G'
Infrastructure
Results
$5,188,888 CJ est. value
Nantucket, MA 02554

Pedestrian and Bicycle Improvements at Various Locations
Infrastructure
Results
$2,119,470 CJ est. value
Lenox, MA 01240

Amelia Drive Mixed Use
New Construction, Infrastructure - 4,055 SF
Pending Verification
$5,000,000 CJ est. value
Nantucket, MA 02554

Surfside Crossing
New Construction, Infrastructure
Pending Verification
$88,000,000 CJ est. value
Nantucket, MA 02554

Hummock Pond Area North Sewer Extension - SEWER-24-004 - Town And County of Nantucket
Infrastructure
Conception
$21,000,000 CJ est. value
Nantucket, MA 02554

Airport Geothermal System
Infrastructure
Bidding
$30,000 CJ est. value
Nantucket, MA 02554

South Valley Pump Station Construction Project - Sub
Renovation, Infrastructure
Post-Bid
$480,000 CJ est. value
Nantucket, MA 02554

Last Updated 12/26/2023 08:31 AM
Project Title

South Valley Pump Station Upgrades - GC

Physical Address View project details and contacts
City, State (County) Nantucket, MA 02554   (Nantucket County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected February 2024
Bids Due View project details and contacts
Estimated Value $1,930,000 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

Contract No: 2023-TON-1011 The Work generally consists of building and equipment improvements of the pump station which includes: replacing the entire pump control panel and all associated electrical equipment; replacing the entire level control panel and pressure transducer level indicators in the wet well; providing temporary pump motor control and pressure transducer during the station upgrades; upgrading the Supervisory Control And Data Acquisition (SCADA) system to include new remote telemetry unit, as well as facility security; replacing an interior emergency diesel generator, fuel tank, exhaust piping, and other appurtenances; selective building and equipment demolition; installing concrete equipment pads; replacing and upgrading HVAC equipment (e.g. louvers, unit heaters, exhaust fans, etc.) to provide better climate control and shutdown upon signal form Fire Alarm System; replacing pump system plug valves in the dry well; installing buried plug valve on the force main in the front yard and associated temporary line stopping; testing the existing grounding ring and replacing faulty segments (as necessary); installing landscaping and/or hardscaping as required to bring the site back to pre-construction conditions. Minimum Wage Rates as determined by the Commissioner of Department of Workforce development under the provision of the Massachusetts General Laws, Chapter 149, Sections 26 to 27 D, as amended, apply to the project 540 calendar days for substantial completion 570 calendar days for final completion Each General Bid and Filed Sub-Bid shall be accompanied by the Bid Security in the amount of 5% of the Bidders maximum Bid Price The successful General Bidder and each selected Filed Sub-Bidder must furnish 100% Performance and Payment Bonds, and will be required to execute the Contract Agreement within 5 days (excluding Saturday, Sunday, and holidays) following notification of the Bid acceptance. The Estimated value of the Contract is approximately $1,930,000 Questions concerning this IFB must be submitted in writing to: Procurement Office, 37 Washington St, Nantucket, MA 02554. Questions may be delivered, mailed, faxed 508-228-7218, or emailed to procurement@nantucket-ma.gov). Written responses will be posted to the Town of Nantuckets website on the procurement page. Liquidated damages will be in the amounts shown below for each calendar day of delay beyond the dates established below: Substantial completion (540 calendar days) $1,000.00 per day Final completion (570 calendar days) $1,000.00 per day. Each Bidder must show evidence that it is licensed under Chapter 149 of the MGL. The Owner further reserves the right to reject any and all Bids or to Award the Contract which in its judgement is in the best interest of the Owner. All questions about the meaning or intent of the Contract Documents shall be submitted in writing or via email to: Hazen and Sawyer 50 Milk Street, Suite 500 Boston, MA 02109 Attn: Daniel Kramer, PE Phone: 617-574-4747 (email: dkramer@hazenandsawyer.com).

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents