Similar Projects
Sidewalk and Curb Ramp Improvements
Infrastructure
Bidding
$600,000 est. value
IN

Municipal Stadium Parking Lot Project
Infrastructure
Bidding
$300,000 est. value
Kokomo, IN 46901

Hamilton Southeastern HS South Parking Lot Reconstruction
Post-Bid
Fishers, IN 46037

Miscellaneous Repair to Curb, Curb and Gutter, Handicap Ramps and other Concrete Flatwork
Post-Bid
Terre Haute, IN 47803

Hessen Cassel Storm and Sidewalk Improvements
Results
Fort Wayne, IN 46800

ADA Ramp Installation Project
Results
Bloomington, IN 47404

Mixed Use Development
New Construction, Infrastructure - 235,000 SF
Pending Verification
$40,000,000 est. value
Columbus, IN

Taylorsville Trailhead
Infrastructure
Bidding
$144,000 est. value
Terre Haute, IN

Mulberry Street Sidewalk and Curb Replacement
Post-Bid
Kokomo, IN 46902

Parking Lot at Washington Park
Results
Bluffton, IN

West 3rd Street Phase 1
Infrastructure
Bidding
$300,000 est. value
Huntingburg, IN 47542

Utica Estates Developer RFP
Post-Bid
Utica, IN

Reconstruction of Curbs and Sidewalks on 10th Street, West of Alley West of John Street
Results
Anderson, IN 46016

2022 Community Development Block Grant
Infrastructure
Bidding
$200,000 est. value
Noblesville, IN

Speedway Overflow Lot
Post-Bid
Speedway, IN 46224

Last Updated 06/24/2022 04:07 AM
Project Title

Construction of the Cardinal Greenway Trail

Physical Address View project details and contacts
City, State (County) Muncie, IN   (Delaware County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project entails the rehabilitation of the Pennsylvania Railroad Bridge at McCulloch Park for pedestrian use. In addition to this, the existing trail needs to be tied into this bridge and the existing trail bridge needs to be demolished. The construction will be phased. The first phase will be rehabilitation of the existing bridge for pedestrian use, followed by tying in of the existing pedestrian trail to the bridge. Once this is completed and open for use, the existing pedestrian trail bridge carrying Cardinal Trail will be demolished. For the construction of the Cardinal Greenway Trail in McCulloch Park (Pennsylvania Railroad Bridge Rehabilitation)

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents