HVAC System Renovation, Clark County Armory
Alteration
Bidding
$1,170,000 est. value
Las Vegas, NV 89115

Fume Hood
Post-Bid
Las Vegas, NV

Replace Ductwork In Dehumidifiers
Post-Bid
Las Vegas, Nelson, NV

J045--Chiller Comprehensive Service and Maintenance
Results

SWRF Untreated Air Pipe Replacement
Results
$1,225,000 est. value
Henderson, NV

99 Ces Replacement Boiler Building 777
Term Contract
Post-Bid
Nellis AFB, Nellis Air Force Base, NV 89191

West Charleston Building C - 2nd Floor HVAC Replacement Phase A
Results
$319,000 est. value
Las Vegas, North Las Vegas, NV 89146

Central Plant Renovation, High Desert State Prison
Alteration
Post-Bid
$7,300,000 est. value
NV

West Flamingo Senior Center Pool Locker Room HVAC Upgrade
Results
$126,350 to $133,000 est. value
Las Vegas, NV

90 Ton High Ambient Air-Cooled Chiller
Alteration
Post-Bid
Las Vegas, NV 89106

Satellite Energy Plant (SEP) Cooling Tower Repair
Results
$350,000 est. value
Las Vegas, NV 89154

Replace HVAC Components, Roof, and Security Walter Johnson Junior High School Academy of International Studies
Alteration
Post-Bid
$7,614,477 est. value
Las Vegas, NV 89145

45--Supply and Replace HVAC Units
Results
Bullhead City, AZ - Boulder City, Echo Bay, NV 89005

Air Duct Cleaning Set-Up
Term Contract
Post-Bid

UNLV CBC-C 1st and 2nd Floor Repipe
Results
$820,000 est. value
Las Vegas, NV 89154

Reported 06/29/2022 12:00 AM
Project Title

North Las Vegas Air Handler 12 Replacement

Physical Address View project details and contacts
City, State (County) North Las Vegas, NV 89030   (Clark County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected December 2022
Bids Due View project details and contacts
Estimated Value $385,000 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of work for this project is to replace the existing AHU-12 located within the mechanical mezzanine in the E wing of the College of Southern Nevada's North Las Vegas campus. An existing outside air louver is intended to be removed in order to facilitate the demolition of the existing AHU and installation of the scheduled AHU. The AHU is scheduled as 2 pieces to allow it to fit through the existing louver opening and structural bracing. The louver will be reinstalled within the existing location. To facilitate the scheduled AHU, the equipment pad will need to be extended and the hydronic piping serving the unit will be upsized for both the hot and chilled water supply and return (approximately 300'). This hydronic piping runs through both exposed and acoustic ceiling tile ceilings. The existing make up air fan adjacent to the AHU is to be replaced as well.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents