Similar Projects
Utilities - US 70
Infrastructure
Design
$371,000 CJ est. value
Broken Bow, OK 74728

Utilities - SH 37
Infrastructure
Design
$530,000 CJ est. value
Garvin, OK 74736

Hochatown - Offsite Improvements - WP #2 - Wastewater Treatment Plant
New Construction, Infrastructure
Sub-Bidding
$10,000,000 CJ est. value
Hochatown, OK 74728

Hochatown - Offsite Improvements - WP #2 - Wastewater Treatment Plant
New Construction, Infrastructure
Sub-Bidding
$10,000,000 CJ est. value
Hochatown, OK 74728

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Slabjacking and Subsealing Services
Infrastructure
Results

Intersection Modification and Traffic Signals US-259
Infrastructure
Results
OK

Utilities - US 259
Infrastructure
Design
$1,030,000 CJ est. value
Broken Bow, OK 74728

Joint Seal/Repair - US-259/SH-4/SH-63/SH-144
Infrastructure
Results
$206,000 est. value

Pavement Rehabilitation - US 70
Infrastructure
Design
$2,060,000 CJ est. value
Broken Bow, OK 74728

All Trades Needed - Broken Bow Housing Authority
New Construction, Infrastructure
Design
$172,000 CJ est. value
Broken Bow, OK 74728

Grade, Drain, Bridge and Surface - US 259
Infrastructure
Design
$20,229,076 CJ est. value
Broken Bow, OK 74728

Last Updated 10/20/2022 11:49 AM
Project Title

Hochatown - Offsite Improvements - WP #1 - Access Roadway & Facility Maintenance Building

Physical Address View project details and contacts
City, State (County) Hochatown, OK 74728   (McCurtain County)
Category(s) Commercial, Heavy and Highway, Sewer and Water
Sub-Category(s) Hotel/Motel, Maintenance, Paving/Reconstruction, Sewage Treatment Plant, Site Development
Contracting Method Competitive Bids
Project Status Construction Commenced, Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $5,000,000 [brand] Estimate
Plans Available from Construction Manager
Owner View project details and contacts
Architect View project details and contacts
Description

As of October 20, 2022, project has been under construction since early September 2022. All sub trades have been awarded. Work Package #1 - includes the Facility Maintenance Building providing for equipment and resort storage, and a gravel access road that provides access to the Wastewater Treatment Plant. The Hochatown Offsite Improvements project includes three major work packages which are essential to support a separately constructed hotel/resort project in Hochatown, Oklahoma. The packages include a Facility Maintenance Building, 100 kgd Wastewater Treatment Plant, and ODOT Highway Expansion. All questions should be directed to Brandon Bentley and Ryan Adler via email at bbentley@heavycontractors.com and radler@heavycontractors.com b

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Concrete, Precast Structural Concrete, Precast Concrete Slabs.
Division 04 - Masonry, Unit Masonry, Concrete Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances and Storefronts, Windows, Hardware, Mirrors.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Flooring, Resilient Flooring, Carpeting, Wall Coverings, Acoustic Treatment, Painting and Coating, Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Flagpoles.
Division 11 - Equipment, Commercial Laundry and Dry Cleaning Equipment, Maintenance Equipment, Ice Machines, Cleaning and Disposal Equipment, Laboratory Equipment.
Division 12 - Furnishings, Window Blinds, Curtains and Drapes, Casework, Furnishings and Accessories, Hospitality Furniture.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Medium-Voltage Electrical Distribution, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 34 - Transportation, Operation and Maintenance of Transportation.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents