Similar Projects
HVAC Water Treatment Chemicals, Service and Testing
Term Contract
Post-Bid
Cranston, RI

RISE Prep Mayoral Academy HVAC Maintenance Services
Post-Bid
Woonsocket, RI 02895

Dust Collection System
Results
Providence, RI

Powers Building - HVAC Terminal Box Control Upgrade Phase II
Results
North Providence, RI 02908

HVAC Maintenance Service
Post-Bid
North Providence, RI 02908

Police Station HVAC
Results
North Scituate, RI

HVAC Preventative Maintenance Program
Term Contract
Post-Bid
Central Falls, RI 02863

S114--Contract for Boilers and Cooling Towers Treatment
Results
Providence, RI 02908

Air Handler and Air Duct Cleaning
Post-Bid
Cranston, RI 02920

Lincoln Rescue Station Front Street Heating Replacement
Results
Lincoln, RI 02865

Auditorium Condensing Unit Replacement
Post-Bid
North Scituate, RI 02857

Replacement of Air Control System for Police Station
Results
East Providence, RI 02914

Installation 2.5 Tom Mitsubishi A/C Split Replacement
Post-Bid
Cranston, RI 02920

Chiller Maintenance and Repair - Rhode Island College
Term Contract
Results
Providence, RI 02908

Generator Exhaust Stack
Post-Bid
$500,000 to $1,000,000 est. value
Providence, RI 02903

Last Updated 07/01/2020 08:52 AM
Project Title

Second Floor Town Hall Air Conditioning

Physical Address View project details and contacts
City, State (County) North Scituate, RI 02857   (Providence County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Replace existing A/C system serving the second floor of the Town Hall. Removal and proper disposal of the present ICP air conditioning condenser located at the rear of the building (M # CA1048VKA1, S # L891234477) and the matching air handler that is located in the attic also including the refrigerant lines and R-22 refrigerant. The refrigerant lines that are buried can be cut below grade and abandoned in place. Furnish all labor and materials necessary to install a new 4-ton air conditioning system to be installed in same location as the equipment removed. The new system shall be manufactured York (condenser model # YCE48B21S) with a SEER rating of 14 and an (air handler model # AE48CX21) or equal. The air handler will be install in a new secondary pan and wet switch and connected to the condensate removal piping. The new equipment will be connected to the present electric wiring. Also install a new Honeywell T-6 or equal thermostat; The condenser will be rotated so new refrigerant lines will from the condenser to the foundation wall and follow the perimeter and be attached to the foundation before being attached to the exterior wall running to the new air handler; The orientation of the air handler will be changed, so the service side of the cabinet faces the access door; The Town of Scituate is sales tax exempt. Include permits, prevailing wages and one year warranty on labor; Start-up and testing.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents