Similar Projects
Paul Norton Elementary Roof Restoration
Alteration
Bidding
Bettendorf, IA 52722

Parks Roof Replacements
Renovation, Alteration
Bidding
Cedar Rapids, IA

Roof Tear-Off and Replacement
Alteration
Post-Bid
Clinton, IA

IVH-Dack Sundeck Roof Replacement
Alteration
Post-Bid
Marshalltown, IA

Young Arena Southeast and Southwest Roof Replacement
Alteration
Results
Waterloo, IA 50701

Residential Roof Removal and Replacement
Alteration
Results
IA

Indian Hills Community College North Campus Roof Renovation
Alteration
Post-Bid
Ottumwa, IA 52501

2021 College Community Roof Improvements
Alteration
Results
$630,000 est. value
Cedar Rapids, IA 52404

DMPS McCombs Middle School Re-Roof
Alteration
Post-Bid
Des Moines, IA 50320

Tower Roof Replacement at J Avenue Water Treatment Plant
Alteration
Results
Cedar Rapids, IA 52402

Oviatt Elementary Partial Roof Replacement
Alteration
Post-Bid
Norwalk, IA 50211

Camp Dodge Building M-15
Renovation, Alteration
Results
Johnston, IA 50131

Hudson High School Roof Replacement
Alteration
Post-Bid
$175,000 est. value
Hudson, IA

Johnson County Celebration Barn Roof Replacement
Alteration
Results
$300,000 est. value
Solon, IA 52333

Duplexes Roofing Installation
Alteration
Post-Bid
Glenwood, IA 51534

Last Updated 03/30/2022 10:29 AM
Project Title

Crossroads Park Elementary Roofing Replacement

Physical Address View project details and contacts
City, State (County) West Des Moines, IA 50266   (Polk County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Project includes the following Roofing Replacement at Crossroads Park Elementary, located at 1050 50th Street, West Des Moines, Iowa 50266. 1. Tear off and replacement of approximately 37,776 square feet of existing roofing system with new vapor barrier, flat-tapered polyisocyanurate insulation, coverboard and 90-mil fully adhered EPDM membrane assembly. 2. New roof assembly will include a thirty (30) year manufacturer’s warranty with a five (5) year contractor installation warranty. 3. All sheet metal copings, flashings, edge, fascia, boots and related accessories will be removed and replaced with new 24-gauge Kynar finished metal. Manufacturer’s twenty (20) year paint warranty shall be included for these components.

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents