Similar Projects
Norwalk Fire Department Station 5 Roof Replacement
Alteration
Bidding
$1,000,000 est. value
Norwalk, CT 06854

Roof Replacement - New Canaan High School
Post-Bid
New Canaan, CT 06840

Saugatuck Elementary School Partial Roof Replacement
Alteration
Post-Bid
Westport, CT 06880

Partial Roof Replacement at Luis Marin School
Results
Bridgeport, CT 06610

Holmes Elementary School Partial Roof Replacement
Results
Darien, CT 06820

Transfer Station Facility Roof Replacement
Alteration
Post-Bid
Fairfield, CT 06824

Hindley Elementary School Partial Roof Replacement
Results
Darien, CT 06820

Tashua Knolls Country Club Roof Replacement
Alteration
Post-Bid
Trumbull, CT 06611

Partial Roof Replacement of the Weston Public Library
Results
Weston, CT 06883

Roof Replacement at Vehicle Maintenance Garage
Alteration
Post-Bid
Stamford, CT 06902

Roof Replacement at Centennial Hall and Grasso Hall WCSU Westside Campus
Results
Danbury, CT 06810

Trumbull Public Schools Roof Replacement at Middlebrook School
Alteration
Post-Bid
$1,500,000 est. value
Trumbull, CT 06611

On-Call Roofing Repair and Project Work
Results
Stamford, CT

On Call Services - All Trades - Citywide
Term Contract
Post-Bid
Bridgeport, CT

Partial Roof Replacement at Glenbrook Fire Department
Results
Stamford, CT 06906

Reported 07/15/2022 12:00 AM
Project Title

DPW Salt Shed Roofing Project

Physical Address View project details and contacts
City, State (County) Norwalk, CT 06855   (Fairfield County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected October 2022
Bids Due View project details and contacts
Estimated Value $70,000
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

1. Remove (1) layer of asphalt shingles down to plywood. 2. Install GAF Weather Watch and ice/water weather barrier, 72 inches along lower roof edges and valleys. 3. Supply and install new step flashing as required. Step flashing will be replaced at the unit price as stated in the response form per step. 4. 4-inch self-adhering seam tape to all plywood seams. 5. Cover remaining wood with GAF Tiger Paw UV stabilized polypropylene underlayment. 6. Supply and install drip and rake edging on all outside and lower roof edges. 7. Once underlayment is completed, install GAF Timberline HDZ Lifetime architectural fiberglass shingles using 6 nails per shingle. 8. Close all hips and ridges, using GAF Timbertex hip and ridge caps. 9. If plywood is required, there will be an additional charge for labor as stated in the response form per sheet and 3/4 " exterior grade 4-ply plywood as stated in the response form per sheet. 10. If any further carpentry work is required, there will be an additional charge as stated in the response form per hour/per man, plus material. All work must be approved prior to start of work in writing.

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents