Similar Projects
Westwood Country Club Redevelopment - Master Plan
New Construction, Demolition, Alteration
Conception
$300,000,000 to $800,000,000 est. value
Amherst, NY

Sitework
Alteration
Conception
Rochester, NY 14623

2021 District Wide Renovations and Addition Contract No. GW.1 General Work Including Asbestos Abatement and Site Work
Infrastructure, Alteration
Bidding
$75,000 est. value
Tannersville, NY

Excavation and Below Grade Construction of the RH-034 Combined Sewer Overflow
Infrastructure
Bidding
$300,000 est. value
New York, NY

Horizontal Directional Drilling - Term Construction Contract #6
Post-Bid
Rochester, NY

Harrington Heights - Site Development
New Construction
Post-Bid
Poughkeepsie, NY 12601

Z1DA--528A8-18-806 D-Stream Upgrade Site Prep (VA-20-00005571)
Results
$500,000 to $1,000,000 est. value
Albany, NY 12203

East Gym Fit Court Site Work and Lighting
Results
Binghamton, NY 13902

Maria Regina High School Ball Field
Renovation
Construction
Hartsdale, NY 10530

Maria College Campus Development
Renovation, Addition - 1,120 SF
Construction
$5,000,000 est. value
Albany, NY 12208

Playground Reconstruction and Site Work at the Springs School
Renovation, Alteration
Bidding
$3,000,000 est. value
East Hampton, NY 11937

RIT - Tait Preserve - Site Improvements
Alteration
Post-Bid
$2,060,000 est. value
Rochester, NY 14625

2019 CIP Phase 1 - Site Preparation
Results
Sodus, NY 14551

Daisy Barn Campground
New Construction
Construction
$1,600,000 est. value
Wilson, NY 14172

2017 Capital Project Phase 3 - Site Work Construction
Infrastructure
Bidding
$3,000,000 est. value
Phoenix, NY 13135

Reported 05/20/2022 12:00 AM
Project Title

503 Main Street Remediation Project

Physical Address View project details and contacts
City, State (County) Niagara Falls, NY 14301   (Niagara County)
Category(s) Heavy and Highway
Sub-Category(s) Site Development
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected June 2022
Bids Due View project details and contacts
Estimated Value $150,000 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The premises being remediated is a single parcel commonly known as: 503 Main Street in the City of Niagara Falls, New York. The project involves petroleum-contaminated soil excavation, removal, transportation, disposal and site restoration services as described in the scope of work and attachments.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents