Similar Projects
RFQ Design - CDBG Possum Hollow Park Lighting
Infrastructure
Conception
$400,000 CJ est. value
Slidell, LA 70458

Menetre Boat Launch - City of Covington
Infrastructure
Conception
$850,000 CJ est. value
Covington, LA 70433

LA 3292: LA 40-wash P/L (Isabel Swamp Rd)
Infrastructure
Design
$2,500,000 CJ est. value
Lacombe, LA 70445

US 90 : West Pearl Br Wire Rope Replacement
Infrastructure
Design
$500,000 CJ est. value
Lacombe, LA 70445

La 1091: US 190 to Cclub Blvd Sidewalks
Infrastructure
Bidding
$2,500,000 CJ est. value
Pearl River, LA 70452

Cross Gates Water System Well Improvements
Infrastructure
Bidding
$640,000 CJ est. value
Slidell, LA 70458

Alta Road Bridge Replacement Project
Demolition, New Construction, Infrastructure
Post-Bid
$696,942 CJ est. value
Bell City, LA 70630

Reiher Road Drainage
Infrastructure
Post-Bid
$120,000 CJ est. value
Mandeville, LA 70471

US 190 Pump Station Force Main Upgrade
Infrastructure
Results
$1,230,201 CJ est. value
Covington, LA 70433

US 190 Pump Station Force Main Upgrade
Infrastructure
Results
$1,230,201 CJ est. value
Covington, LA 70433

Slidell Memorial Hospital SMH Three Story Building Addition
Addition, Demolition, Infrastructure
Construction
$36,000,000 CJ est. value
Slidell, LA 70458

Station 19 Fire Station
New Construction, Infrastructure
Construction
$1,493,300 CJ est. value
Slidell, LA 70461

Medline Distribution Center
New Construction, Infrastructure - 800,000 SF
Pending Verification
$53,000,000 CJ est. value
Covington, LA 70433

Bonterra Subdivision, Phases 2 and 3
New Construction, Infrastructure
Pending Verification
$19,000,000 CJ est. value
Pearl River, LA 70452

Columbia Street Bridge Replacement - City of Covington
Infrastructure
Conception
$1,500,000 CJ est. value
Covington, LA 70433

Last Updated 10/27/2023 05:05 PM
Project Title

Foxbriar Street Drainage Repair

Physical Address View project details and contacts
City, State (County) Slidell, LA 70458   (Saint Tammany County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected December 2023
Bids Due View project details and contacts
Estimated Value $47,450 [brand] Estimate
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Each Quote must be sealed. In addition, the outside of the envelope, box or package containing the Quote should be marked with the following information. Name and Address, State Contractor's License Number (if the estimated cost of the work is $50k or more), Quote Number, and the Quote Name. Quotes submitted without this information may be deemed non-responsive. The Parish requires a Contractor to remove/replace existing concrete sidewalk, panels and wrap pipe joints due to base failures as specified on Foxbriar Street (R08V020; S13-T9-R14) located in Slidell, Louisiana. Contractor must provide all labor, materials, tools, supervision, and equipment to remove/replace existing concrete sidewalk, panels and wrap pipe joints due to base failures as specified on Foxbriar Street (R08V020; S13-T9-R14) located in Slidell, Louisiana. The time period to complete the work shall be forty-five (45) calendar days from issuance of the Notice to Proceed issued by the Parish St. Tammany Parish Government reserves the right to reject any or all quotes and to waive informalities *Estimated budget is $47,450.15.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents