Similar Projects
Annular Steel Culvert
Term Contract
Bidding
Boulder, CO

2021 Road and Drainage Project
Bidding
Gunnison, CO

SH 103 Culvert Replacement
Post-Bid
Idaho Springs, CO 80452

High Point Neighborhood Park West
Post-Bid
Denver, CO

Embankment Material
Results
CO

Culvert Relining (Spray-Applied)
Results
Less than $1,000,000 est. value
CO

Middle Cow Creek Culvert
Bidding
Steamboat Springs, CO

Detention Ponds Improvement Project
Post-Bid
Golden, CO

Suckla #1 Reclamation
Results
Less than $25,000 est. value
Naturita, CO 81422

Homestake Surge Pond Rehabilitation Project
Bidding
CO

District Infrastructure To Service Solstice Filings 2-4
Post-Bid
Centennial, CO

Pipe Supply for City Streets Division
Results
Grand Junction, CO 81501

Design Services for Cherry Creek Reservoir Shoreline Stabilization ESS and Tl PRFS
Bidding
CO

Constructing Two Extended Detention Basins, Trenching, and Drainage Pipe
Post-Bid
$5,000,000 to $20,000,000 est. value
CO

Pmaa, Wray SFU - Pond Liners
Results
Less than $361,669 est. value
Wray, CO 80758

Last Updated 01/20/2021 04:17 PM
Project Title

Belleview-Clarkson Drainage Improvements

Physical Address View project details and contacts
City, State (County) Greenwood Village, CO   (Arapahoe County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of constructing drainage improvements at the intersection of E. Belleview Ave. (SH-088), including replacement of an existing type 16 valley inlet, curb and gutter, crosspans, and asphalt paving. All improvements will be completed on the south leg of the intersection. Additionally, modifications to existing Englewood Utilities facilities are required to construct concrete flatwork in accordance with the lines and grades identified in the plan set. This includes replacement of an existing water main air release valve and removal and replacement of the water main vault lid. The project will be constructed in two phases. Phase 1 will consist of replacement of the Englewood Utilities air release valve. Phase 2 will consist of the remaineder of the planned improvements, after field verification of water vault clearances, structural design modifications (if necessary), and fabrication of the new water vault lid.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents