Similar Projects
Indoor Practice Facility
New Construction - 170,000 SF
Conception
Eugene, OR 97401

New 4-6 School Building on South Hill - 2022 Bond - Umatilla School District
Addition, Demolition, New Construction, Infrastructure
Design
$45,200,000 CJ est. value
Umatilla, OR 97882

Westview High School - Pride Plaza & Secure Vestibule
Renovation - 50,560 SF
Sub-Bidding
$4,000,000 CJ est. value
Portland, OR 97229

Sylvania Campus Health Technology (HT) Building West - 2022 Bond - Portland Community College
Renovation
Post-Bid
$25,000,000 CJ est. value
Portland, OR 97219

RFP Construction Manager - Construction Manager General Contractor (CMGC) Services: 53rd Avenue Park West
Alteration
Post-Bid
$10,500,000 est. value
Hillsboro, OR 97124

D-Bat Interior Tenant Improvement
Renovation - 21,440 SF
Construction
Tigard, OR 97223

NW Fencing Interior Improvements
Renovation - 17,962 SF
Construction
Tigard, OR 97223

2021 Bond - Knappa School District
New Construction, Renovation, Infrastructure
Pending Verification
$20,000,000 CJ est. value
Astoria, OR 97103

RFP Construction Manager - Cannon Beach Elementary School Renovation
Infrastructure, Renovation - 13,500 SF
Post-Bid
$700,000 CJ est. value
Cannon Beach, OR 97110

Greenburg Building Exterior
Renovation - 206,910 SF
Construction
Tigard, OR 97223

RFP Construction Manager - Scio Middle School Gym Seismic Retrofit
Infrastructure
Post-Bid
$1,276,040 CJ est. value
Scio, OR 97374

4J School District Multi Site High School Interior Renovations
Renovation
Construction
$450,000 CJ est. value
Eugene, OR 97401

Jefferson High School Development Modernization
Demolition, New Construction, Renovation, Infrastructure
Post-Bid
$21,000,000 CJ est. value
Portland, OR 97217

Eagle Point High School Gym Seismic Rehab Project - Eagle Point School District
Renovation
Construction
$2,498,235 CJ est. value
Eagle Point, OR 97524

South Wasco County School District K-8 Gymnasium, Kitchen & Cafeteria Building
Renovation
Post-Bid
$200,000 CJ est. value
Maupin, OR 97037

Last Updated 02/16/2024 09:13 AM
Project Title

Multi - Site Gym Floor Refinishing 2023

Physical Address View project details and contacts
City, State (County) Eugene, OR 97401   (Lane County)
Category(s) Entertainment/Recreation
Sub-Category(s) Athletic Facility
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected March 2024
Bids Due View project details and contacts
Estimated Value $23,996 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Quoters Are Encouraged to Send a Test Email to Email Address Above to Ensure They Have It Correct and That We Received It Accordingly. For Purposed of Receipt Time, the Sent Timestamp From the Quoter's Email Account Will Be Used. Briefly, the Work is Described as: Screen and Recoat of (9) Wood Gym Floors at 8 Sites. All Quotations Must Be Submitted on the Form Provided and Emailed to: Cip@4j.lane.eduonly Electronic Quotes Will Be Accepted. A License to Work With Asbestos-containing Materials Under Ors 468a.720 is Required for This Project.for Every Bid $100,000 or Greater, All Contractors and Subcontractors Shall Have a Public Works Bond, in the Amount of $30,000, Filed With the Construction Contractors' Board (Ccb), Before Starting Work on the Project, Unless Exempt.each Quote Shall Contain a Statement Indicating Whether the Quoter is a "resident Quoter", as Defined in Ors 279a.120. Each Quote Shall Contain a Statement That the "contractor Agrees to Be Bound by and Comply With the Provisions of Ors 279c.800 to 279c.870 Regarding Payment of Prevailing Wages" if Applicable. (if Total Project Cost is Above $50k, Contractor Required to Pay Prevailing Wages.)contractor Shall Certify Nondiscrimination in Obtaining Required Subcontractors, in Accordance With Ors 279a.110.the Successful Quoter Will Be Required to Furnish a Performance Bond and Labor and Materials Payment Bond in the Full Amount of the Contract Price. Certificates of Insurance as Described in the Terms and Conditions Will Be Required. Each Quote Must Be Submitted on the Prescribed Form. Each Quote Shall Be Accompanied by a Copy of a Surety Bond, Cashier's Check, or Certified Check, Executed in Favor of Eugene School District 4j, in the Amount Not Less Than Ten Percent (10%) of the Total Quote. Should the Quoter Refuse to Enter Into Such Contract or Fail to Furnish Certificates of Insurance as Required by the Supplementary Conditions Within Five (5) Working Days After Contract Forms Are Provided to the Quoter, the Amount of the Quote Security Shall Be Forfeited to the Owner as Liquidated Damages, Not as a Penalty. School District 4j Reserves the Right to Reject Any and All Proposals Received as a Result of This Request for Quotations and Select the Quote Which Appears to Be in the Best Interest of the District. **Bid notes:

Details

Division 01 - General Requirements, Construction Facilities.
Division 03 - Concrete, Concrete Forming, Concrete Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings.
Division 09 - Finishes, Painting.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 31 - Earthwork, Site Clearing, Earth Moving.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Athletic and Recreational Surfacing, Fences and Gates.
Division 33 - Utilities, Water Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents