Similar Projects
Us 22/322 Pm
Infrastructure
Conception
$2,850,000 est. value

Sr 1003 - Brady Twp Line To Sr 1001
Alteration
Design
$2,899,132 est. value

I-376/Banksville Interchange
Infrastructure
Design
$58,016,014 est. value
Blanchard, PA

State Correctional Institution (SCI) Rockview Laundry Building Renovations and Pavement - Phase 1
Infrastructure, Renovation
Bidding
$4,000,000 CJ est. value
Bellefonte, PA 16823

State Correctional Institution (SCI) Rockview Laundry Building Renovations and Pavement - Phase 1
Infrastructure, Renovation
Bidding
$4,000,000 CJ est. value
Bellefonte, PA 16823

2021 Roadway Improvements - Beaver Avenue (SR 0026) & Locust Lane Improvements
Post-Bid
$45,000 est. value
State College, PA 16801

Compost Facility Access Drive Paving Overlay Project
Post-Bid
State College, PA 16801

Lyonstown Road Roadway Base Repairs
Results
Bellefonte, PA

Gill Street Multi-Modal Connector
Results
Less than $393,452 est. value
State College, PA 16801

University Park Airport Rehabilitate Taxiway A
Renovation - 1,700 SF
Construction
$9,200,000 est. value
State College, PA 16803

PSU - UP - Hastings, McKean, & Bigler Roads Utility Infrastructure Repair & Expansion
New Construction, Demolition
Construction
State College, University Park, PA 16802

RFP Design - Environmental Health and Safety (EH and S) Chemical and Radiation Waste Accumulation Facility
New Construction, Infrastructure - 11,000 SF
Pending Verification
$7,200,000 CJ est. value
State College, PA 16803

Patton Crossing Phase 2 Centre First Bank
New Construction, Infrastructure - 9,036 SF
Pending Verification
$2,100,000 CJ est. value
State College, PA 16803

Exit 161 Bellefonte Interchange
Infrastructure
Design
$127,187,925 CJ est. value
Bellefonte, PA 16823

East Beaver Avenue Streetlight and Curb Ramp Project
Infrastructure
Bidding
$300,000 CJ est. value
State College, PA 16801

Last Updated 08/23/2022 08:32 AM
Project Title

CDBG Nittany Village and South Hills Park Improvements Project

Physical Address View project details and contacts
City, State (County) State College, PA 16801   (Centre County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Park/Playground, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

PROJECT DESCRIPTION: This project consists of earthwork, clearing and grubbing, tree removal and planting, construction of a new pedestrian walking path and access drives, and installation with park appurtenances. The project is funded through the Community Development Block Grant Program and is subject to all related federal regulations. Federal prevailing wages established under the Davis-Bacon Act will apply to this contract. The contract documents contain requirements addressing labor wage rates, labor standards, nondiscrimination in hiring practices, goals for minority and female (MBE/WBE) participation, participation by Section 3 residents and businesses, illegal alien employment prohibition, E-Verify documentation, and related matters. All contractors and sub-contractors working on this project will be required to comply with the Pennsylvania Human Relations Act No. 222 and PA Steel Products Procurement Act. Bidders shall certify that they are not debarred from participating in state and federally funded contracts. With their Bid, Bidders must provide Section 3 Utilization and MBE/WBE contacts and commitments. Performance, payment, and maintenance bonds in 100% of the contract amount are also required. The Owner reserves the rights to reject any or all bids, to waive any defects, errors, omissions, irregularities or informalities in a bid or the bidding procedure, and to accept any bid, which it may deem to be for or in its best interest. Each bidder must deposit with his/her bid, security in the amount, form and subject to the conditions provided in the Information for Bidders. The Owner does not discriminate based on actual or perceived race, color, religion, sex, ancestry, marital status, mental or physical disability, or the use of a guide or support animal and/or mechanical aids because of physical handicap, sexual orientation, national origin, gender identity or expression, age, or familial status. Borough Council may accept or reject any or all bids or hold all bids for a period of 45 days from the date of Bid Opening before making a decision. Bids shall remain irrevocable for 45 days after the actual date of the opening thereof unless award is delayed due to the required approval of another government agency, the sale of bonds, or the award of a grant or grants; in which case, bids shall be irrevocable for 120 days in compliance with Act 317 of 1978, as amended. No bidder may withdraw a bid within 45 days after the actual date of the opening thereof without the risk of forfeiting the bid bond submitted with the bid.

Details

Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents