Similar Projects
Y1da--Construction | Install Car Charging Stations Project 539-21-203
Design
$5,000,000 to $10,000,000 est. value
Cincinnati, OH 45220

Y1da--Construction | Install Car Charging Stations Project 539-21-203
Design
$5,000,000 to $10,000,000 est. value
Cincinnati, OH 45220

69KV Hess Substation Deadend and Metering Addition
Alteration
Bidding
Saint Clairsville, OH

Lights and Poles for Bryson Park District (Material Only)
Post-Bid
Celina, OH 45822

Electrical Meterbase Replacements
Post-Bid
Manchester, OH 45144

Energy Performance Contracting
Results
Huber Heights, OH 45424

EV Charging Stations Canal Winchester Park and Ride
Results
Less than $51,482 est. value
Columbus, OH

DOSD Electrical Upgrades Program 650346-100003
Post-Bid
Columbus, OH

Electrical Improvements Phase 2 - Door Access Controls
Results
Less than $2,017,790 est. value
Dublin, OH 43016

Overhead Power Lines
Post-Bid
$500,000 to $1,000,000 est. value
Swanton, OH

ODOT District 12 Garfield Heights Lighting Upgrades
Results
Less than $340,000 est. value
Garfield Heights, OH 44125

Generators
Term Contract
Post-Bid
OH

Public Electric Vehicle Charging Infrastructure
Results

Ohio Hills Health Services
Renovation
Post-Bid
Barnesville, OH 43713

DOP - 2020 - LED Luminaires, ATB2 Series
Results
Columbus, OH

Last Updated 12/01/2021 03:30 PM
Project Title

Solar PV/Battery Energy Storage System (BESS) Developers

Physical Address View project details and contacts
City, State (County) Kent, OH 44240   (Portage County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Approximately 6MW,Ground mounted, fixed mount or single axis tracking, solar PV installation coupled with a 3MW Battery Energy Storage System on Morgan Property site at 1900 East Summit Street. The appropriate size of the hybrid system is to be determined by the respondent and will be configured for grid and PV charging, co-located with the solar PV facilities. The vegetated, relatively flat site is about 33 acres total with a small body of water at about 3.7 acres. Underground feeders would route north under East Summit Street, under City of Kent utilities and under a high-pressure Dominion East Ohio Gas line on the north side of the street that primarily serves the Kent State CHP Plant gas turbine generators, then west. The connection point to the Kent State 13.2 kV distributed electric system would be at the existing WKSU building switch near the corner of East Summit Street and Loop Road. Preferred maximum 20-year total PPA Contract, but will consider longer contracts to maximize savings over grid supplied electric power.

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents