Similar Projects
Upgrade or Ventilation Fy22 NRM
Alteration
Design
$1,000,000 to $5,000,000 est. value
Loma Linda, CA 92354

Residential Weatherization Services
Renovation
Bidding
Placerville, CA

City Hall North Governair Unit Replacement
Alteration
Bidding
$750,000 est. value
Bakersfield, CA 93306

HVAC and Mechanical Products
Term Contract
Post-Bid

HVAC and Mechanical Products
Term Contract
Post-Bid

City Hall Building HVAC Upgrades
Results
Less than $125,000 est. value
Santa Clarita, CA 91355

Better Way Electrical Service or HVAC Project
Alteration
Results
$100,000 to $300,000 est. value
Yuba City, CA 95991

HVAC Upgrades
Alteration
Bidding
San Jacinto, CA 92583

HVAC Replacement
Term Contract
Post-Bid
$24,000 to $29,000 est. value
Alameda, CA

Minor Professional HVAC Repairs
Term Contract
Results
Santa Rosa, CA

Air Intake Dampers Replacement Services
Alteration
Bidding
Oakland, CA 94612

HVAC on Call Maintenance and Repair Services
Alteration
Post-Bid
CA

Replacement of Jail Rooftop HVAC 1-6
Alteration
Results
$810,000 est. value
San Rafael, CA 94903

SJH Facilities Maintenance Electrical and HVAC
Term Contract
Bidding
Friant, CA

CHP Humboldt Area Office - HVAC Maintenance Services
Alteration
Post-Bid
Arcata, Willow Creek, CA 95521

Reported 02/17/2022 12:00 AM
Project Title

HVAC Replacement Probation North Annex

Physical Address View project details and contacts
City, State (County) Hanford, CA 93230   (Kings County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

HVAC Removal and Installation - Remove and dispose of (4) Bard heat pumps model number 45WH1-A0CD004. Install (4) new Bard 3 ½ ton heat pumps with electric heat strip. Model number W42HAA05XP4. The contractor will provide a new filter rack installed inside of the units. The contractor is to fabricate or modify duct work to accommodate the new units. The contractor is to provide (4) new heat pump thermostats with emergency heat option. The contractor is to provide a (4) new fusible disconnects rated for the new units. If main breaker needs to be sized different from the existing breaker, the contractor will supply and change out the breaker to the correct size. If wiring needs to be changed, the contractor will provide and install the new wiring The contractor will supply any electrical fittings and conduit. If there are any building penetrations made by the contractor, the contractor is responsible for sealing them. The contractor is responsible for any damage caused during removal and replacement of the unit. The contactor shall follow all title 24 building codes pertaining to this job. The contractor is responsible for any drawings or paper work required to obtain a permit. The contractor is responsible for obtaining a building permit with the Kings County Community Development Agency. No variation from this scope of work is accepted unless expressed written permission has been approved. The Contractor is responsible for liability insurance, additional insured and waiver of subrogation for workers compensation all listing County of Kings, its officers, employees & agents. 1400 W. Lacey Blvd. Hanford CA 93230. The Contractor is responsible for any cost associated with obtaining these insurance certificates. The project will be done on normal working days and hours. Contractor will be responsible for clean up of all trash and debris related to this project on a daily basis and upon completion.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents