Similar Projects
Last Updated | 03/08/2019 04:18 AM |
Project Title | RAS Valve Replacement Project |
Physical Address | View project details and contacts |
City, State (County) | Tuscaloosa, AL (Tuscaloosa County) |
Category(s) | Single Trades |
Sub-Category(s) | Plumbing |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $50,000 |
Plans Available from | Municipal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | This project shall consist of Replacement of the existing 12" plug valve and check valve at the North Aeration Building at the Hilliard N. Fletcher Wastewater Treatment Plant. The City of Tuscaloosa shall furnish the plug valve and check valve. There is no valve present to isolate the plug and check valve. All RAS pumps must remain in operation during this install. Pressure on the active line is less than or equal to ten (10) pounds per square inch. The contractor shall furnish all tools, equipment, and labor necessary to complete the project. | ||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |