Similar Projects
2021 Preventive and Critical Lining
Bidding
$3,500,000 to $3,900,000 est. value
Denver, CO 80202

H199--Grease Trap and Sand Trap Maintenance - 554
Bidding
Aurora, CO 80045

Installation of The A-12 to A-12A-2 Sanitary Sewer Replacement
Post-Bid
Aspen, CO 81611

2020 Sewer Trenchless Point Repairs
Post-Bid
Salida, CO 81201

Miller Sanitary and Reuse Pipelines
Results
Less than $1,427,052 est. value
Lafayette, CO

Leon Sreet Sanitary Sewer Project
Results
$30,000 est. value
Delta, CO

Banning Lewis Ranch Village A - Public 18 PVC Sanitary Sewer Trunkline Plan Improvements Erosion Control, Sanitary Sewer and Underdrain
New Construction
Construction
Colorado Springs, CO 80927

Sterling Ranch Middle Fork Street
New Construction
Post-Bid
Highlands Ranch, CO

2020 SACWSD Wastewater System Rehabilitation
Results
Commerce City, CO 80022

Westgate 2020 Sanitary Sewer Rehabilitation Project
Post-Bid
Lakewood, CO

Notice of Request for Contractor Qualifications
Term Contract
Results
Thornton, CO 80229

2020 Capital Improvements Project
Post-Bid
Lakewood, CO

Waste Water Rehabilitation Program
Results
Colorado Springs, CO 80947

Ponderosa Community Stabilization Project
Post-Bid
Boulder, CO

Force Main and Siphon Condition Assessment and Cleaning
Results
Denver, CO 80229

Last Updated 06/14/2021 03:41 PM
Project Title

2021 Manhole Rehabilitation Project

Physical Address View project details and contacts
City, State (County) Pueblo, CO   (Pueblo County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $350,000 to $400,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project will consist of rehabilitating existing manholes located throughout the City of Pueblo by patching manholes with a cementitious material and placing an epoxy coating. Specifically, the rehabilitation will include rebuilding 30 benches and troughs with fast-setting cementitious material, removing and replacing 2 manholes, 663 vertical feet of epoxy coating, and placing 636 vertical feet of cementitious material. Construction shall be completed as detailed in the plans and specifications for this project.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents